Superior Building
- Based in
- Petaluma
- On San Francisco permits
- Sep 2008 to Jan 2021
- Last 24 months
- 0 permits filed
22 permits since 2000: 12 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2018 | Completed final sign-off Oct 2018 | 4376 21st St | replace rotted top boards of deck surface. no change to railings. replacing top boards with with wood boards. replace in-kind, less than 50%.Details
replace rotted top boards of deck surface. no change to railings. replacing top boards with with wood boards. replace in-kind, less than 50%. | $1,600 |