Back to bathroom remodel contractors
Superb Builders & Custom Made Cabinetry
- Based in
- Burlingame
- On San Francisco permits
- Jun 2021 to Feb 2026
- Last 24 months
- 10 permits filed
37 permits since 2000: 28 completed, 5 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 14 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 1330 Alabama St | unit a: add a new bathroom at 1st floor. (non structural work)Details
unit a: add a new bathroom at 1st floor. (non structural work) | $30,000 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 1330 Alabama St | 1st/f rear unit: remodel of bathroom fan and kitchen and non structrual partitions to be removed. sink location for kitchen to be relocated. additional outlets and light fixtures.Details
1st/f rear unit: remodel of bathroom fan and kitchen and non structrual partitions to be removed. sink location for kitchen to be relocated. additional outlets and light fixtures. | $50,000 |
| Dec 10, 2025 | In progress issued Mar 2026 | 2630 Divisadero St | revision 202404049303- convert 223 sf of garage of habitable. add new 48 sq. ft. reconfigure interior stair and add (n) panty on 2nd floor. reconfigure closets and bathroom on 3rd floor. revision windows on 2nd floor.Details
revision 202404049303- convert 223 sf of garage of habitable. add new 48 sq. ft. reconfigure interior stair and add (n) panty on 2nd floor. reconfigure closets and bathroom on 3rd floor. revision windows on 2nd floor. | $30,000 |
| Aug 25, 2025 | Completed final sign-off Oct 2025 | 65 Albion St | bathroom remodel in kind, same location, no structural changes and no exterior work.Details
bathroom remodel in kind, same location, no structural changes and no exterior work. | $20,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 2677 35th Av | 1 kitchen and 1 bathroom (hallway bathroom). in kind. no changes of layout, same location. no exterior work. kitchen approx 120 sqft bathroom appox 40 sqftDetails
1 kitchen and 1 bathroom (hallway bathroom). in kind. no changes of layout, same location. no exterior work. kitchen approx 120 sqft bathroom appox 40 sqft | $15,000 |
| Jan 7, 2025 | Completed final sign-off Feb 2025 | 10 South Park | unit #9: 2 bathroom remodel in kind. new plumbing fixtures same location 2 new shower pan no wall to be changed no exterior work.Details
unit #9: 2 bathroom remodel in kind. new plumbing fixtures same location 2 new shower pan no wall to be changed no exterior work. | $25,000 |
| Nov 27, 2023 | Completed final sign-off Apr 2025 | 23 Prospect Av | interior alteration on the 2nd and 3rd fl. on 2nd fl kitchen and bathroom will be remodeled; 3rd fl - 2 bedrooms will be combined as a primary bedroom; 3rd fl - 2 bathrooms will be combined as primary bathroomDetails
interior alteration on the 2nd and 3rd fl. on 2nd fl kitchen and bathroom will be remodeled; 3rd fl - 2 bedrooms will be combined as a primary bedroom; 3rd fl - 2 bathrooms will be combined as primary bathroom | $66,000 |
| Oct 4, 2023 | Never finaled issued Oct 2023, no final | 23 Prospect Av | two bathroom and one kitchen remodel in-kind, no structural work, no exterior work, upgrade elecrical as needed new 70 amps subpanel , new plumbing fixtures. bathrooms: tiles, vanity, toilet, tubs. kitchenl tiles, countertops, cabinets, appliances. no moving walls, no layout changes.Details
two bathroom and one kitchen remodel in-kind, no structural work, no exterior work, upgrade elecrical as needed new 70 amps subpanel , new plumbing fixtures. bathrooms: tiles, vanity, toilet, tubs. kitchenl tiles, countertops, cabinets, appliances. no moving walls, no layout changes. | $65,000 |
| May 4, 2023 | Completed final sign-off Aug 2025 | 2227 Lombard St | remodel (2) units, bathrooms, kitchens, addition of lower room & bathrooms, additional (2) bathrooms-(1) each unit. no exterior facade work.Details
remodel (2) units, bathrooms, kitchens, addition of lower room & bathrooms, additional (2) bathrooms-(1) each unit. no exterior facade work. | $350,000 |
| Mar 8, 2023 | Never finaled issued Mar 2023, no final | 64 Mars St | remodel 1 kitchen & 1 bathroom. all remodel in-kind. no exterior work , no structural work. same location.Details
remodel 1 kitchen & 1 bathroom. all remodel in-kind. no exterior work , no structural work. same location. | $35,000 |
| Nov 14, 2022 | Completed final sign-off Sep 2023 | 10 Crown Tr | guest bathroom and powder room remodel in kind no structural changes, no exterior work, same location all new plumbing fixtures, new electrical as needed.Details
guest bathroom and powder room remodel in kind no structural changes, no exterior work, same location all new plumbing fixtures, new electrical as needed. | $15,000 |
| Oct 31, 2022 | Completed final sign-off Oct 2023 | 10 Crown Tr | removal of arch between kitchen and family rm, remodel kitchen. remodel master bath and closet 2nd fl. conversion of closet into bdrm 2nd f. add window. modification of lower 3 steps at main fl. widen opening betwn family and hallway and living room and hallwayDetails
removal of arch between kitchen and family rm, remodel kitchen. remodel master bath and closet 2nd fl. conversion of closet into bdrm 2nd f. add window. modification of lower 3 steps at main fl. widen opening betwn family and hallway and living room and hallway | $75,000 |
| Oct 21, 2022 | Completed final sign-off Feb 2023 | 240 Lombard St | one kitchen and one bathroom remodel in kind: add 3 recessed led lights on hallway: new plumbing fixtures, new electrrical as needed: replace subppanel to ampsDetails
one kitchen and one bathroom remodel in kind: add 3 recessed led lights on hallway: new plumbing fixtures, new electrrical as needed: replace subppanel to amps | $35,000 |
| Sep 14, 2022 | Expired or cancelled withdrawn Nov 2025 | 1955 Page St | interior remodel in kind remove and replace all finishes same location, no walls to alterate no exterior changes, includes of 1 kitchen and 2 bathroom each unit (all 3 apartments) on reference complaint # 202295414Details
interior remodel in kind remove and replace all finishes same location, no walls to alterate no exterior changes, includes of 1 kitchen and 2 bathroom each unit (all 3 apartments) on reference complaint # 202295414 | $175,000 |
| Aug 4, 2022 | Completed final sign-off Nov 2022 | 140 South Van Ness Av | remodel of one kitchen one full bathroom and powder room, same locaation, like for like no structural work, new appliances, new plumbing fixturesDetails
remodel of one kitchen one full bathroom and powder room, same locaation, like for like no structural work, new appliances, new plumbing fixtures | $42,000 |
| Aug 4, 2022 | Completed final sign-off Nov 2022 | 1362 23rd Av | remodel of one kitchen, two bathrooms, no structural changes like for like new cabinets, new appliances, new plumbing, fixtures same location, upgrade elec as neededDetails
remodel of one kitchen, two bathrooms, no structural changes like for like new cabinets, new appliances, new plumbing, fixtures same location, upgrade elec as needed | $33,000 |
| Apr 19, 2022 | Completed final sign-off Nov 2022 | 21 Santa Paula Av | conversion of 1 bedroom into a bathroom & a walk-in closet. conversion of 1 bedroom into 2 bedrooms. windening of stairs from 2'7" to 3'0" wide. remodel kitchen including removal of a wall between kitchen & dining room. remodel bathrooms.Details
conversion of 1 bedroom into a bathroom & a walk-in closet. conversion of 1 bedroom into 2 bedrooms. windening of stairs from 2'7" to 3'0" wide. remodel kitchen including removal of a wall between kitchen & dining room. remodel bathrooms. | $95,000 |
| Mar 11, 2022 | Completed final sign-off Apr 2022 | 2090 Quesada Av | bathroom remodel in kind repair shower shift lavatory sink new tile, vanity floor paintDetails
bathroom remodel in kind repair shower shift lavatory sink new tile, vanity floor paint | $16,000 |
| Feb 18, 2022 | Completed final sign-off Dec 2022 | 1471 Clay St | interior remodel including ktichen and bathroom. addition of 2 new bathrooms.Details
interior remodel including ktichen and bathroom. addition of 2 new bathrooms. | $300,000 |