Sunwise Solar Solutions
- Based in
- Los Gatos
- On San Francisco permits
- Apr 2026 to Apr 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 2921 Webster St | solar permit: installing 17 solar pv modules, 440 watts per module, total no. of rating 7.48 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 10 kwh each in capacity, ess units will not be closer than 3 feet | installation of 7.48kw pv system andDetails
solar permit: installing 17 solar pv modules, 440 watts per module, total no. of rating 7.48 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 10 kwh each in capacity, ess units will not be closer than 3 feet | installation of 7.48kw pv system and |