Permit GraphShortlistSan Francisco building permits since 2000

Sun's Construction; Dba Sunwoo Won Ik

Contractor license
908368
State license record
Based in
South San Francisoc
On San Francisco permits
Jul 2009 to Feb 2022
Last 24 months
0 permits filed

8 permits since 2000: 6 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 2Stairs 2Kitchen remodel 1Bathroom remodel 1

2 deck permits: 2 completed. Typically 2 days from filing to permit and 28 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 14, 2014Completed
final sign-off May 2014
1 Quintara Stwood deck on 6"x6" post one side and ledger and other side,dim's 20'x10'x9 foot high.
Details
Permit
201404143114
Status
complete
Filed
Apr 14, 2014
Permit issued
Apr 18, 2014
Final sign-off
May 22, 2014
Declared cost
$12,000
Address
1 Quintara St

wood deck on 6"x6" post one side and ledger and other side,dim's 20'x10'x9 foot high.

Open the permit page

$12,000
Jul 28, 2009Completed
final sign-off Aug 2009
40 Alton Avchange sheetrock due to water damage, paint, replacement of dryrot on 2 deck in backyard, less than 50%. replace sheetrock at stairway leading to the 2nd fl, 2nd fl hallway, stairway to roof from 2nd fl. aprox 160 sf/5pc 4x8 wall board
Details
Permit
200907283619
Status
complete
Filed
Jul 28, 2009
Permit issued
Jul 28, 2009
Final sign-off
Aug 20, 2009
Declared cost
$5,000
Address
40 Alton Av

change sheetrock due to water damage, paint, replacement of dryrot on 2 deck in backyard, less than 50%. replace sheetrock at stairway leading to the 2nd fl, 2nd fl hallway, stairway to roof from 2nd fl. aprox 160 sf/5pc 4x8 wall board

Open the permit page

$5,000