Sun's Construction; Dba Sunwoo Won Ik
- Based in
- South San Francisoc
- On San Francisco permits
- Jul 2009 to Feb 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 2 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2014 | Completed final sign-off May 2014 | 1 Quintara St | wood deck on 6"x6" post one side and ledger and other side,dim's 20'x10'x9 foot high.Details
wood deck on 6"x6" post one side and ledger and other side,dim's 20'x10'x9 foot high. | $12,000 |
| Jul 28, 2009 | Completed final sign-off Aug 2009 | 40 Alton Av | change sheetrock due to water damage, paint, replacement of dryrot on 2 deck in backyard, less than 50%. replace sheetrock at stairway leading to the 2nd fl, 2nd fl hallway, stairway to roof from 2nd fl. aprox 160 sf/5pc 4x8 wall boardDetails
change sheetrock due to water damage, paint, replacement of dryrot on 2 deck in backyard, less than 50%. replace sheetrock at stairway leading to the 2nd fl, 2nd fl hallway, stairway to roof from 2nd fl. aprox 160 sf/5pc 4x8 wall board | $5,000 |