Back to bathroom remodel contractors
Sun Construction
- Based in
- Daly City
- On San Francisco permits
- Apr 2001 to Apr 2011
- Last 24 months
- 0 permits filed
44 permits since 2000: 34 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2009 | Completed final sign-off Oct 2009 | 1060 Prague St | remodel existing bed room, exercise room and two bath rooms in ground fl, to comply w/ nov 200875405. add a deck in 2nd floor.Details
remodel existing bed room, exercise room and two bath rooms in ground fl, to comply w/ nov 200875405. add a deck in 2nd floor. | $35,000 |
| Sep 23, 2008 | Completed final sign-off Mar 2009 | 695 Miramar Av | remodel of ground floor: new office, family room. 1 bedroom, 1 full bath on ground floor, relocate laundry, water heater, and furnace. new window at north side, 2 new windows at south prop line.Details
remodel of ground floor: new office, family room. 1 bedroom, 1 full bath on ground floor, relocate laundry, water heater, and furnace. new window at north side, 2 new windows at south prop line. | $45,000 |
| Jul 21, 2008 | Completed final sign-off May 2009 | 1060 Prague St | 2nd floor. remodel existing kitchen and 2 bathrooms, same configuration and no structural works, all lighting to be fluorescent lights.Details
2nd floor. remodel existing kitchen and 2 bathrooms, same configuration and no structural works, all lighting to be fluorescent lights. | $25,000 |
| Sep 5, 2007 | Completed final sign-off Nov 2007 | 72 Pierce St | addition of one new bathroom at rear of building. remodeling of one existing bathroom. all new fixtures in both bathrooms. also, new tile work. all work on 3rd levelDetails
addition of one new bathroom at rear of building. remodeling of one existing bathroom. all new fixtures in both bathrooms. also, new tile work. all work on 3rd level | $15,000 |
| May 11, 2001 | Completed final sign-off Dec 2001 | 366 Page St | replace kitchen cabinets & countertop & vinyl flooring. replace bathroom plumbing fixture & fcts. &Details
replace kitchen cabinets & countertop & vinyl flooring. replace bathroom plumbing fixture & fcts. & | $150,000 |