Summit Technology Group Inc
- Based in
- Santa Rosa
- On San Francisco permits
- Jul 2022 to Dec 2025
- Last 24 months
- 2 permits filed
5 permits since 2000: 2 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | In progress issued Apr 2026 | 33 Robinhood Dr | solar permit: installing 35 solar pv modules, 420 watts per module, total no. of rating 14.7 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | 1. install 14.7kw photovolDetails
solar permit: installing 35 solar pv modules, 420 watts per module, total no. of rating 14.7 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | 1. install 14.7kw photovol | |
| Aug 27, 2025 | Expired or cancelled cancelled Sep 2025 | 1271 46th Av | solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | electrical work related to approveDetails
solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | electrical work related to approve | $58,000 |
| Aug 27, 2024 | Completed final sign-off Sep 2025 | 2290 Green St | revision 202207198868: correct project scope description pv solar (4.8 kw) ess 27.0 kw. as built: a. add e stop in front of sfd b. change circuits in gateway (2-30a) c. add 2nd dissconnect for batteries. revise sheets pv1., 1.1, 2.0,4.1Details
revision 202207198868: correct project scope description pv solar (4.8 kw) ess 27.0 kw. as built: a. add e stop in front of sfd b. change circuits in gateway (2-30a) c. add 2nd dissconnect for batteries. revise sheets pv1., 1.1, 2.0,4.1 | |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 2290 Green St | revision to permit# 202207188868: as-built planset - showing 2 ac disconnectsDetails
revision to permit# 202207188868: as-built planset - showing 2 ac disconnects | |
| Jul 19, 2022 | Completed final sign-off Sep 2025 | 2290 Green St | install a new 8.0kw roof mounted pv system with ess (28 kwh total capacity in garage)Details
install a new 8.0kw roof mounted pv system with ess (28 kwh total capacity in garage) | $3,500 |