Summit Construction
- Based in
- Daly City
- On San Francisco permits
- Apr 2003 to Nov 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 8 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2025 | Completed final sign-off Jul 2026 | 1932 Quint St | 1/f: remodel bedroom, add side entry door. one bedroom, tub bathroom, kitchenette and media room per plans.Details
1/f: remodel bedroom, add side entry door. one bedroom, tub bathroom, kitchenette and media room per plans. | $87,000 |
| Jul 2, 2019 | Completed final sign-off Oct 2019 | 1914 44th Av | add 1 bathroom on main floor (2nd fl) and remodel 1 (e) bathroomDetails
add 1 bathroom on main floor (2nd fl) and remodel 1 (e) bathroom | $8,000 |
| Oct 19, 2018 | Completed final sign-off Jan 2019 | 725 Pacheco St | at front façade, replace 8 windows with marvin ultimate aluminum-clad wood casement windows. no other work.Details
at front façade, replace 8 windows with marvin ultimate aluminum-clad wood casement windows. no other work. | $18,000 |
| Nov 13, 2015 | Completed final sign-off Jan 2016 | 4337 Balboa St | repair thewall corner and window casing wood (trim) in the backyard (repair in kind)Details
repair thewall corner and window casing wood (trim) in the backyard (repair in kind) | $1,300 |
| Aug 19, 2015 | Completed final sign-off Feb 2017 | 725 Pacheco St | rear addition at 2nd floor. add 1 mud room, 1 laundry and 1 family room.Details
rear addition at 2nd floor. add 1 mud room, 1 laundry and 1 family room. | $50,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 269 Bradford St | convert existing half bath to full bath by adding one shower on ground floorDetails
convert existing half bath to full bath by adding one shower on ground floor | $3,000 |
| Oct 3, 2014 | Never finaled issued Oct 2014, no final | 269 Bradford St | remodel kitchen & bathroom, replace counter, flooring, sink, toilets.Details
remodel kitchen & bathroom, replace counter, flooring, sink, toilets. | $5,000 |
| Mar 23, 2009 | Completed final sign-off Apr 2009 | 162 Bronte St | remodel bathroom at upstairs & remodel kitchen upstairs, no structural work.Details
remodel bathroom at upstairs & remodel kitchen upstairs, no structural work. | $17,000 |
| Aug 27, 2007 | Completed final sign-off Oct 2007 | 1333 42nd Av | add new study room, play room and full bath room on the ground floor.Details
add new study room, play room and full bath room on the ground floor. | $20,000 |
| Apr 10, 2003 | Completed final sign-off Jul 2003 | 2794 Golden Gate Av | remodel bathroom, kitchen.Details
remodel bathroom, kitchen. | $25,100 |