Back to bathroom remodel contractors
Stuart Construction
- Based in
- Richmond
- On San Francisco permits
- Sep 2000 to Mar 2021
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2020 | Never finaled issued Jul 2020, no final | 142 Josiah Av | remodel bathroom upper floo, no change to floor plan/walls. minor dry rot repairs to joist & sub floorDetails
remodel bathroom upper floo, no change to floor plan/walls. minor dry rot repairs to joist & sub floor | $35,000 |
| Mar 7, 2008 | Completed final sign-off May 2008 | 2010 Castro St | bathroom remodel, new plumbing fixtures & tile. no structural changes, high efficacy, lighting or controlled by manual on, auto off switch.Details
bathroom remodel, new plumbing fixtures & tile. no structural changes, high efficacy, lighting or controlled by manual on, auto off switch. | $25,000 |
| Aug 11, 2004 | Completed final sign-off Jan 2005 | 610 Teresita Bl | remodel guest study and bathroom behind garageDetails
remodel guest study and bathroom behind garage | $35,000 |
| Apr 27, 2004 | Completed final sign-off Feb 2006 | 142 Josiah Av | rear addition, bathroom-horizontal additionDetails
rear addition, bathroom-horizontal addition | $80,000 |
| Sep 7, 2001 | Completed final sign-off Feb 2002 | 444 Douglass St | bathroom remodel (adding 1 18" by 80" window)Details
bathroom remodel (adding 1 18" by 80" window) | $62,000 |