Back to bathroom remodel contractors
Structura General Contractor Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Apr 2012
- Last 24 months
- 0 permits filed
38 permits since 2000: 30 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2010 | Completed final sign-off Dec 2011 | 240 Lake Merced Hill No Bl | redesign of rear 1st floor of townhouse to include a bedroom, bathroom & redesign hall/laundry. design req'd. an 8 ft. expansion beyond the current rear wall, contained beneath the current deck that serves the house 2nd floor property is al condo, part of apod.Details
redesign of rear 1st floor of townhouse to include a bedroom, bathroom & redesign hall/laundry. design req'd. an 8 ft. expansion beyond the current rear wall, contained beneath the current deck that serves the house 2nd floor property is al condo, part of apod. | $70,000 |
| Nov 1, 2007 | Expired or cancelled expired Apr 2010 | 3794 16th St | on roof: new 351 sq ft floor includes family room, roof deck, & spiral stair. remodel kitchen & bathroom w/(n) cabinets, lighting, plumbing fixtures - upgrade electrical panel. 5/1/08 revised site plans and changed to full permit -exterior changesDetails
on roof: new 351 sq ft floor includes family room, roof deck, & spiral stair. remodel kitchen & bathroom w/(n) cabinets, lighting, plumbing fixtures - upgrade electrical panel. 5/1/08 revised site plans and changed to full permit -exterior changes | $220,000 |
| Oct 1, 2007 | Completed final sign-off Oct 2010 | 1278 Church St | modifications to permit applicaition #200608240419/r1-new floor plan @ unit bathrooms, minor plan modifications at garage, new bedroom at unit 1(2nd floor), new window @ church street facade, structural modifications.Details
modifications to permit applicaition #200608240419/r1-new floor plan @ unit bathrooms, minor plan modifications at garage, new bedroom at unit 1(2nd floor), new window @ church street facade, structural modifications. | $15,000 |
| Oct 13, 2006 | Completed final sign-off Nov 2007 | 220 Esmeralda Av | remodel 2 kitchens & 2 bathrooms. replace all cabinets, appliance, counter @ kitchen. new lighting.replace all fixtures, floor tile @ bathrooms, new lighting.Details
remodel 2 kitchens & 2 bathrooms. replace all cabinets, appliance, counter @ kitchen. new lighting.replace all fixtures, floor tile @ bathrooms, new lighting. | $25,000 |
| Nov 8, 2005 | Completed final sign-off Aug 2006 | 779 28th Av | remodel kitchen and 2 & 1/2 baths, remove and replace interior finishes. remodel kitchen, replace sink, cabinets, cntrtop, appliances, and flooring. remodel bath, replace lighting, plumbing fixtures, tiles, tub, toilet. no structural workDetails
remodel kitchen and 2 & 1/2 baths, remove and replace interior finishes. remodel kitchen, replace sink, cabinets, cntrtop, appliances, and flooring. remodel bath, replace lighting, plumbing fixtures, tiles, tub, toilet. no structural work | $50,000 |
| Oct 11, 2005 | Completed final sign-off Mar 2006 | 240 Ivy St | to remodel 3 kitchens, 3 bathrooms, to change drywall, no structural work involved, provide flourescent light fixturesDetails
to remodel 3 kitchens, 3 bathrooms, to change drywall, no structural work involved, provide flourescent light fixtures | $75,000 |
| Aug 29, 2005 | Completed final sign-off Oct 2005 | 373 Liberty St | bathroom remodel. no structural work. provide fluorescent light fixtureDetails
bathroom remodel. no structural work. provide fluorescent light fixture | $5,000 |
| Jul 22, 2005 | Completed final sign-off Mar 2006 | 244 Ivy St | to change kitchen, bathroom.plaster. (units under 500 ft) install 5/8" drywall type. no structuralDetails
to change kitchen, bathroom.plaster. (units under 500 ft) install 5/8" drywall type. no structural | $18,000 |
| Apr 1, 2005 | Completed final sign-off Aug 2005 | 162 Beaver St | kitchen and bath remodel. change cabinets, fixtures, tile floor. provide fluorescent lightsDetails
kitchen and bath remodel. change cabinets, fixtures, tile floor. provide fluorescent lights | $20,000 |