Back to bathroom remodel contractors
Stronger Building Services
- Based in
- San Leandro
- On San Francisco permits
- Sep 2012 to Jun 2026
- Last 24 months
- 2 permits filed
22 permits since 2000: 17 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 239 days from filing to permit and 540 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2016 | Completed final sign-off Jun 2018 | 101 Capistrano Av | convert rear of garage to living space at 1st floor. also remodel 2nd floor kitchen, bath and bedroom area. approx 28 to 30 cu of excavation.Details
convert rear of garage to living space at 1st floor. also remodel 2nd floor kitchen, bath and bedroom area. approx 28 to 30 cu of excavation. | $65,000 |
| Sep 15, 2015 | Completed final sign-off Aug 2017 | 1363 Grant Av | for residential cost estimation: soft story retrofit per sfbc chapter 34b, engineering design criteria based on 2012 iebc appendix a-4. improvement @ 1st floor/basement. some ada imrpovement @ entry & bath for 20% upgrade. replace (e) door @ front entrance & add (n) hadrail @ front step &Details
for residential cost estimation: soft story retrofit per sfbc chapter 34b, engineering design criteria based on 2012 iebc appendix a-4. improvement @ 1st floor/basement. some ada imrpovement @ entry & bath for 20% upgrade. replace (e) door @ front entrance & add (n) hadrail @ front step & | $9,760 |