Stricklin Construciton
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2024
- Last 24 months
- 0 permits filed
104 permits since 2000: 71 completed, 1 in progress, 8 never finaled, 24 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
7 deck permits: 4 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 502 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2024 | In progress issued May 2024 | 3865 19th St | remove and replace (e) roof membrane at garage, remove and replace (e) decking, stucco +reinstall railings as necessary to perform roof replacement.Details
remove and replace (e) roof membrane at garage, remove and replace (e) decking, stucco +reinstall railings as necessary to perform roof replacement. | $20,000 |
| Jan 14, 2022 | Completed final sign-off Oct 2023 | 3865 19th St | revision to issued permit# 2021-1117-2601. replace existing rotted deck framing in kind. revised height of exterior retaining wall and add structural design.Details
revision to issued permit# 2021-1117-2601. replace existing rotted deck framing in kind. revised height of exterior retaining wall and add structural design. | |
| Jul 10, 2017 | Never finaled issued Jul 2019, no final | 3562 18th St | vertical addition. renovation of upper floor condo including (n) bathrooms & kitchen. (n) internal stair to roof. addition of roof top penthouse & deck.Details
vertical addition. renovation of upper floor condo including (n) bathrooms & kitchen. (n) internal stair to roof. addition of roof top penthouse & deck. | $370,000 |
| Sep 1, 2016 | Completed final sign-off Jan 2018 | 3871 19th St | reconstruction of present deck above garage at front in kind and replace two existing doors with one 3-panel fleetwood sliding door 15' door - replacing railing with code required railing made with clear glass.Details
reconstruction of present deck above garage at front in kind and replace two existing doors with one 3-panel fleetwood sliding door 15' door - replacing railing with code required railing made with clear glass. | $91,000 |
| Mar 1, 2016 | Completed final sign-off Jun 2018 | 3874 17th St | replace back yard deck and stair "in-kind" same size. construct new 1-hr wall on property line. repalce concrete slab and 1'-6" high +/- retaining wallDetails
replace back yard deck and stair "in-kind" same size. construct new 1-hr wall on property line. repalce concrete slab and 1'-6" high +/- retaining wall | $15,000 |
| May 8, 2014 | Completed final sign-off Aug 2014 | 461 02nd St | unit#651 remove existing redwood deck and replace with pedestal support system and concrete pavers. n/a ordinance #155-13.Details
unit#651 remove existing redwood deck and replace with pedestal support system and concrete pavers. n/a ordinance #155-13. | $45,000 |
| May 4, 2012 | Expired or cancelled expired Sep 2015 | 285 Douglass St | remove and replace tile @ rear deck / 2nd floor balcony and lightwell. replace deck membrane and repair substrate as necessary. less than 50%. repair dryrot at rear yard stairs and deck landing.Details
remove and replace tile @ rear deck / 2nd floor balcony and lightwell. replace deck membrane and repair substrate as necessary. less than 50%. repair dryrot at rear yard stairs and deck landing. | $50,000 |