Back to bathroom remodel contractors
Stodoni Construction
- Based in
- San Anselmo
- On San Francisco permits
- Sep 2003 to Oct 2016
- Last 24 months
- 0 permits filed
68 permits since 2000: 61 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 21 completed. Typically 0 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2014 | Completed final sign-off Nov 2015 | 2421 Turk Bl | remodel after fire, remodel 2 baths and 1 kitchen on 2/f. remodel 1 bath and 1 kitchen on 3/f, replace windows, insulation, drywall, new flooring, new lighting and outlets, replace 2 main pnaels, replace heating ducts, no wall relocation, replace in kind, maintain fire rating.Details
remodel after fire, remodel 2 baths and 1 kitchen on 2/f. remodel 1 bath and 1 kitchen on 3/f, replace windows, insulation, drywall, new flooring, new lighting and outlets, replace 2 main pnaels, replace heating ducts, no wall relocation, replace in kind, maintain fire rating. | $450,000 |
| Jun 24, 2013 | Completed final sign-off Jul 2013 | 825 La Playa | partial bathroom remodeling. in one bathroom (at hallway) replace bathtub, faucet, tiles and 1 outlet. no lighting changes. no change in walls and opening.Details
partial bathroom remodeling. in one bathroom (at hallway) replace bathtub, faucet, tiles and 1 outlet. no lighting changes. no change in walls and opening. | $5,600 |
| Jun 24, 2013 | Completed final sign-off Oct 2013 | 2218 43rd Av | add bathroom at 1st /garage level & legalize storage room. (bathroom lighting shall be high efficacy or controlled by manual on sensor)Details
add bathroom at 1st /garage level & legalize storage room. (bathroom lighting shall be high efficacy or controlled by manual on sensor) | $15,000 |
| Oct 3, 2012 | Completed final sign-off Nov 2012 | 132 Bartlett St | bathroom remodeling. install hydrotub, new tiles, sink and toilet. install heated floor electrical not movimng any walls, secondary heat not exceeding 20 kilowatts and provide time-kimiting device not exceeding 30 miniutes section 151(b)3. hallway bathroomDetails
bathroom remodeling. install hydrotub, new tiles, sink and toilet. install heated floor electrical not movimng any walls, secondary heat not exceeding 20 kilowatts and provide time-kimiting device not exceeding 30 miniutes section 151(b)3. hallway bathroom | $12,500 |
| Jun 30, 2011 | Completed final sign-off Jul 2011 | 1478 20th Av | bathroom repair. remove tiles to waterproof the walls. remove the toilet to locate the leak. install new ceiling fan. install tiles. if necessary replace the faucet for bathtub.Details
bathroom repair. remove tiles to waterproof the walls. remove the toilet to locate the leak. install new ceiling fan. install tiles. if necessary replace the faucet for bathtub. | $7,000 |
| Oct 26, 2010 | Completed final sign-off Jan 2011 | 351 El Camino Del Mar | guest bathroom remodeling in hallway. replace extg fan. replace bathtub and rotate it 90 degree. new bathtub/shower valve. relocate the toilet. install new vanity.new tiles around bathtub and on the floor.Details
guest bathroom remodeling in hallway. replace extg fan. replace bathtub and rotate it 90 degree. new bathtub/shower valve. relocate the toilet. install new vanity.new tiles around bathtub and on the floor. | $8,000 |
| Oct 1, 2010 | Completed final sign-off Dec 2011 | 35 Park St | kitchen and bath remodeled at 2nd floor; relocate laundry; existing one is on the first floorDetails
kitchen and bath remodeled at 2nd floor; relocate laundry; existing one is on the first floor | $22,000 |
| Dec 7, 2009 | Completed final sign-off Jan 2010 | 2950 Clay St | two bathrooms remodeling; all fixtures @ the same location. replace bathtub, toilet seats. install (n) tiles on the floor and tub & shower surround. install (4) new lights on each bathrooms. new shower pan with tiles & replace fans.Details
two bathrooms remodeling; all fixtures @ the same location. replace bathtub, toilet seats. install (n) tiles on the floor and tub & shower surround. install (4) new lights on each bathrooms. new shower pan with tiles & replace fans. | $21,400 |
| May 27, 2009 | Completed final sign-off Aug 2009 | 180 Marietta Dr | kitchen & bathroom remodel. replace cabinet & counter in kitchen. upgrade the electrical. tile on the floor on kitchen & retile the bathroom. no bathtub replacement. replace toilet & sink in kind. provide h.e. lights per title 24 requirement. provide exhaust fan in bathroom.Details
kitchen & bathroom remodel. replace cabinet & counter in kitchen. upgrade the electrical. tile on the floor on kitchen & retile the bathroom. no bathtub replacement. replace toilet & sink in kind. provide h.e. lights per title 24 requirement. provide exhaust fan in bathroom. | $16,000 |
| May 14, 2009 | Completed final sign-off Aug 2009 | 2427 Turk Bl | work @ unit# 2427 only. bathroom & half bathroom remodel located on 2nd floor. replace bathtub, plumbing, fixtures & tiles. install fans. relocate the sink. install new toilet. new electrical circuit for gfci's. provide h.e. lights or o.s. in bath.Details
work @ unit# 2427 only. bathroom & half bathroom remodel located on 2nd floor. replace bathtub, plumbing, fixtures & tiles. install fans. relocate the sink. install new toilet. new electrical circuit for gfci's. provide h.e. lights or o.s. in bath. | $15,000 |
| Sep 11, 2008 | Completed final sign-off Oct 2008 | 627 Lisbon St | bathroom remodel. all fixtures stay in the same location. replace bathtub, tiles, fan, sink & toilet.Details
bathroom remodel. all fixtures stay in the same location. replace bathtub, tiles, fan, sink & toilet. | $8,200 |
| Mar 4, 2008 | Completed final sign-off Mar 2008 | 1706 33rd Av | bathroom remodel-all fixtures replaced in the same location. no bath tub replacement. install new tiles on walls and floor. replace faucetsDetails
bathroom remodel-all fixtures replaced in the same location. no bath tub replacement. install new tiles on walls and floor. replace faucets | $9,000 |
| Oct 12, 2007 | Completed final sign-off Oct 2007 | 1505 Francisco St | revision to app#200709072046. keep a portion from the window in bath new window size 5'x1'.Details
revision to app#200709072046. keep a portion from the window in bath new window size 5'x1'. | |
| Sep 7, 2007 | Completed final sign-off Oct 2007 | 1505 Francisco St | master bathroom remodeling. remove non-structural projection on master bathroom window and block window opening. there is ex. mechanical ventilation in the bathroom. replace wall tiles, fixtures and floor coveringsDetails
master bathroom remodeling. remove non-structural projection on master bathroom window and block window opening. there is ex. mechanical ventilation in the bathroom. replace wall tiles, fixtures and floor coverings | $16,000 |
| Jun 28, 2007 | Completed final sign-off Oct 2007 | 1507 Francisco St | bathroom and kitchen remodel, new cabinets, refrigerator,dishwasher, gargage disposal, microwave, hardwood floor, refinishing, recessed lights on ceiling, new over and under cabinet lights, bath: replace mixing valve, bathtub, toilet, sink, new tiles on wall and floor, to comply with title 24 energcDetails
bathroom and kitchen remodel, new cabinets, refrigerator,dishwasher, gargage disposal, microwave, hardwood floor, refinishing, recessed lights on ceiling, new over and under cabinet lights, bath: replace mixing valve, bathtub, toilet, sink, new tiles on wall and floor, to comply with title 24 energc | $25,000 |
| Jun 12, 2007 | Completed final sign-off Oct 2007 | 1505 Francisco St | kitchen bathroom and wc remodeling.all fixture stay at the same location. replacing cabinets, counters and exterior door.Details
kitchen bathroom and wc remodeling.all fixture stay at the same location. replacing cabinets, counters and exterior door. | $35,000 |
| Jun 5, 2007 | Completed final sign-off Aug 2007 | 46 Yukon St | 1 bathroom remodeling, all fixture will star at the same location. provide high efficancy lightingDetails
1 bathroom remodeling, all fixture will star at the same location. provide high efficancy lighting | $10,000 |
| Apr 26, 2006 | Completed final sign-off Aug 2006 | 1504 Funston Av | rev. to pa#2006/01/06/1621 - correct floor plan layout dimensions at bath & hallway at garage levelDetails
rev. to pa#2006/01/06/1621 - correct floor plan layout dimensions at bath & hallway at garage level | |
| Feb 2, 2006 | Completed final sign-off Mar 2006 | 222 28th St | bathroom remodeling. all fixture in same location replacement. bathtub with whirl pool. new fan installation (2nd floor)Details
bathroom remodeling. all fixture in same location replacement. bathtub with whirl pool. new fan installation (2nd floor) | $7,500 |
| Apr 11, 2005 | Completed final sign-off May 2005 | 1324 Lyon St | bathroom and toilet room remodeling. replacement the (e) bathtub w/whitepool, toilet, sink, window.Details
bathroom and toilet room remodeling. replacement the (e) bathtub w/whitepool, toilet, sink, window. | $10,800 |
| Feb 3, 2005 | Completed final sign-off Mar 2005 | 615 Alvarado St | bathroom-remodeling replacement ex iron pipe with copper fan installation ; raising the ceiling in tDetails
bathroom-remodeling replacement ex iron pipe with copper fan installation ; raising the ceiling in t | $7,000 |