Stine Builders
- Based in
- Oakland
- On San Francisco permits
- May 2004 to Sep 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 7 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2024 | Completed final sign-off Jan 2025 | 135 Moffitt St | construct (n) redwood deck off 2nd floor, 6-9 by 13-10. (n) stairs from deck to lower patio. (n) 1 hr rated fire wall on south east side. replace (e) 2nd floor window with (n) patio door 6 by 6-8. same width and head height as windowDetails
construct (n) redwood deck off 2nd floor, 6-9 by 13-10. (n) stairs from deck to lower patio. (n) 1 hr rated fire wall on south east side. replace (e) 2nd floor window with (n) patio door 6 by 6-8. same width and head height as window | $40,000 |
| Nov 30, 2005 | Completed final sign-off Jan 2006 | 2650 Divisadero St | replace dryrotted members of existing rear deck; less than 50 percent anticipated. no extension or addition to deck size, existing footings to be used if adequate as determined by structural engineer after expose & investigationDetails
replace dryrotted members of existing rear deck; less than 50 percent anticipated. no extension or addition to deck size, existing footings to be used if adequate as determined by structural engineer after expose & investigation | $7,000 |