Stewart Cheung Const
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2015
- Last 24 months
- 0 permits filed
29 permits since 2000: 29 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 0 days from filing to permit and 9 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2006 | Completed final sign-off Jun 2006 | 1755 14th Av | repair/replace existing wood deck on 2nd floor at the rear of building.Details
repair/replace existing wood deck on 2nd floor at the rear of building. | $3,000 |
| Apr 4, 2005 | Completed final sign-off Apr 2005 | 1 Tracy Pl | repair rear stairway, stringer at 2nd floor, remove rotten deck wood from roof. add handrails. sameDetails
repair rear stairway, stringer at 2nd floor, remove rotten deck wood from roof. add handrails. same | $1,000 |
| Mar 19, 2004 | Completed final sign-off Apr 2004 | 178 Prague St | repair extg rear stairway and deck and some replace if requiredDetails
repair extg rear stairway and deck and some replace if required | $1,800 |