Back to bathroom remodel contractors
Steven Wong Builders
- Based in
- San Leandro
- On San Francisco permits
- Mar 2011 to Feb 2016
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 5 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2015 | Never finaled issued Apr 2016, no final | 1606 17th Av | revision to 201509106565. relocate doors and rearrange bath room fixtures at gr fl. convert half bath into full bath at 2nd flDetails
revision to 201509106565. relocate doors and rearrange bath room fixtures at gr fl. convert half bath into full bath at 2nd fl | $3,000 |
| May 23, 2014 | Completed final sign-off May 2015 | 3515 20th St | remove (e) powder room on 3rd floor per plan. add one bedrooms, two bathrooms & remodel(e) bathroom & (e) kitchen on 3rd floor per plan.Details
remove (e) powder room on 3rd floor per plan. add one bedrooms, two bathrooms & remodel(e) bathroom & (e) kitchen on 3rd floor per plan. | $35,000 |
| Feb 14, 2014 | Completed final sign-off Jun 2014 | 1601 La Salle Av | interior remodel only (room down). add 2 bed rooms, 2 bathrooms and one family room in ground floor.Details
interior remodel only (room down). add 2 bed rooms, 2 bathrooms and one family room in ground floor. | $50,000 |
| Jul 11, 2013 | Completed final sign-off Oct 2013 | 2946 21st Av | remodel existing bath, add one new bath, remodel kitchen, replace sheetrock at kitchen, bedroom and living/dinning with type "x" 5/8". upgrade whole house lighting and electrical outlet per plan.Details
remodel existing bath, add one new bath, remodel kitchen, replace sheetrock at kitchen, bedroom and living/dinning with type "x" 5/8". upgrade whole house lighting and electrical outlet per plan. | $30,000 |
| Jul 13, 2012 | Completed final sign-off Oct 2012 | 920 Darien Wy | replace plumbing fixture at 2nd bathroom. same location and same kind.Details
replace plumbing fixture at 2nd bathroom. same location and same kind. | $2,000 |
| Mar 8, 2012 | Completed final sign-off Jun 2012 | 607 23rd Av | interior remodel only - add one gym room & 1 bath at garage. no structural under this permit.Details
interior remodel only - add one gym room & 1 bath at garage. no structural under this permit. | $10,000 |
| Feb 24, 2012 | Completed final sign-off Jun 2012 | 607 23rd Av | remove cabinet & counter, bath tub, install new cabinet, bath tub, new counter, fixture, new sink and faucet, high effiacy lightin in bathrmDetails
remove cabinet & counter, bath tub, install new cabinet, bath tub, new counter, fixture, new sink and faucet, high effiacy lightin in bathrm | $7,000 |
| Feb 21, 2012 | Completed final sign-off Sep 2012 | 107 Rolph St | interior remodel only to correct nov 201279895. add one new bath at 2nd floor. remodel two bedrooms and one new bath at 1st floor. no structural work.Details
interior remodel only to correct nov 201279895. add one new bath at 2nd floor. remodel two bedrooms and one new bath at 1st floor. no structural work. | $40,000 |
| Jun 24, 2011 | Completed final sign-off May 2014 | 1355 44th Av | 2 stories addition of (e) single family house with 2 new bedrooms, 1 new bath. remodel (e) ground floor with 1 new bedroom & 1 new storage. remodel (e) 2nd floor bedroom & hallway per plan.Details
2 stories addition of (e) single family house with 2 new bedrooms, 1 new bath. remodel (e) ground floor with 1 new bedroom & 1 new storage. remodel (e) 2nd floor bedroom & hallway per plan. | $50,000 |
| Mar 7, 2011 | Completed final sign-off Sep 2011 | 359 Paris St | remodeling ground flr: adding (n) family rm. (n) half-bath, (n) guest rm. @ ground flr. w/ remodeling kitchen @ 2nd. floor as per plan.Details
remodeling ground flr: adding (n) family rm. (n) half-bath, (n) guest rm. @ ground flr. w/ remodeling kitchen @ 2nd. floor as per plan. | $40,000 |