Back to bathroom remodel contractors
Steven Lau Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jan 2011
- Last 24 months
- 0 permits filed
25 permits since 2000: 22 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2009 | Completed final sign-off Oct 2009 | 3473 Washington St | remodel 2nd fl, back bathroom. (replace cabinets, counter tile & plumbing & elect. fixtures.Details
remodel 2nd fl, back bathroom. (replace cabinets, counter tile & plumbing & elect. fixtures. | $15,000 |
| Dec 12, 2007 | Completed final sign-off Jul 2008 | 2490 Filbert St | change front single glazed windows to double glazed. remodel master bathroom (new cabinets, plumbing fixtures, tile etc.)Details
change front single glazed windows to double glazed. remodel master bathroom (new cabinets, plumbing fixtures, tile etc.) | $45,000 |
| Dec 12, 2007 | Completed final sign-off May 2008 | 1 Bluxome St | work @ apt# 402 only. remodel (e) kitchen & upstair bathroom. on 4th floor. replacement of cabinets, appliances etc. new tile, plumbing fixtures.Details
work @ apt# 402 only. remodel (e) kitchen & upstair bathroom. on 4th floor. replacement of cabinets, appliances etc. new tile, plumbing fixtures. | $40,000 |
| Aug 14, 2007 | Completed final sign-off Nov 2007 | 287 30th Av | remodel master bedroom & bathroom. no structural work. bathroom lighting to be fluorescant or on occupant sensor.Details
remodel master bedroom & bathroom. no structural work. bathroom lighting to be fluorescant or on occupant sensor. | $20,000 |
| Oct 6, 2004 | Completed final sign-off Dec 2004 | 571 09th Av | modify (e) pa#22004/07/08/8345 to add skylight above rear bathroomDetails
modify (e) pa#22004/07/08/8345 to add skylight above rear bathroom | |
| Jul 8, 2004 | Completed final sign-off Mar 2005 | 571 09th Av | horizontal addition- amend existing permit pa 200401073485-to add vestibule to master bathDetails
horizontal addition- amend existing permit pa 200401073485-to add vestibule to master bath | $17,000 |
| Jan 7, 2004 | Completed final sign-off Dec 2004 | 571 09th Av | remodel master & hall bathrooms, (replace fixts & tile). no structural alterations.Details
remodel master & hall bathrooms, (replace fixts & tile). no structural alterations. | $40,000 |
| Dec 11, 2000 | Completed final sign-off Mar 2001 | 1359 Union St | remodel bathroom, replace plumbing fixtures,cabinets,window.no changes to size/location of windows,Details
remodel bathroom, replace plumbing fixtures,cabinets,window.no changes to size/location of windows, | $8,000 |
| Mar 9, 2000 | Completed final sign-off Jun 2000 | 357 29th Av | remodel second floor hall-bathroom: relocate & replace plbg fixtures,install new ceramic tile, etcDetails
remodel second floor hall-bathroom: relocate & replace plbg fixtures,install new ceramic tile, etc |