Back to bathroom remodel contractors
Steve Logan Construction Inc
- Based in
- Mill Valley
- On San Francisco permits
- May 2022 to May 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2022 | Completed final sign-off Jan 2023 | 506 10th Av | repair work necessiated due to damage caused by sewage overflow. work to include new sheet rock (less than 50% repair), painting, replacement of floor coverings with tile (bathroom) and vinyl flooring (remainder), replacement of base moldings, resetting of toilet and sink after floor installation.Details
repair work necessiated due to damage caused by sewage overflow. work to include new sheet rock (less than 50% repair), painting, replacement of floor coverings with tile (bathroom) and vinyl flooring (remainder), replacement of base moldings, resetting of toilet and sink after floor installation. | $12,000 |