Back to bathroom remodel contractors
Steve J. White General Constractor
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Dec 2023
- Last 24 months
- 0 permits filed
25 permits since 2000: 21 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2022 | Completed final sign-off Apr 2023 | 1024 Guerrero St | remodel one kitchen & one bathroom. non structural. new cabinets & counters tops, & bathroom shower, new drywall & insulation, wiring and plumbing fixtures. new 60a electrical subpanel in kitchen area.Details
remodel one kitchen & one bathroom. non structural. new cabinets & counters tops, & bathroom shower, new drywall & insulation, wiring and plumbing fixtures. new 60a electrical subpanel in kitchen area. | $40,000 |
| Jun 24, 2021 | Expired or cancelled expired Dec 2023 | 3325 Kirkham St | remodel one kitchen and one bathroom non structural: vinyl windows in rear bedrooms (2) same size and location: relocate 4ft furnace and water heater on ground floor new metal bestos flue, vent to roof.Details
remodel one kitchen and one bathroom non structural: vinyl windows in rear bedrooms (2) same size and location: relocate 4ft furnace and water heater on ground floor new metal bestos flue, vent to roof. | $40,000 |
| Jan 19, 2018 | Completed final sign-off Jun 2018 | 525 Judah St | remodel bathroom & kitchen. no rough framing or change of (e) layout.Details
remodel bathroom & kitchen. no rough framing or change of (e) layout. | $35,800 |
| Apr 18, 2017 | Completed final sign-off Dec 2018 | 2550 39th Av | demolish unpermitted ground floor partitions( front bldng) remove & replace rear exterior door & windows, addign ground floor master suite & master bathroom, relocate & replace water heater furnanceDetails
demolish unpermitted ground floor partitions( front bldng) remove & replace rear exterior door & windows, addign ground floor master suite & master bathroom, relocate & replace water heater furnance | $30,000 |
| Mar 1, 2017 | Completed final sign-off Jun 2017 | 3333 Steiner St | unit #1: remodel kitchen and bath. new fixtures, cabinets, & appliances in existing location. no work on interior partition or relocating walls.Details
unit #1: remodel kitchen and bath. new fixtures, cabinets, & appliances in existing location. no work on interior partition or relocating walls. | $35,000 |
| May 13, 2015 | Completed final sign-off Feb 2016 | 1018 Guerrero St | remodel (e) kitchen & bathroom in 1018 guerrero.kitchen lighting min 50% of permanent light = high efficacy. bathroom lighting min one high efficacy light. additional high efficacy or vacancy sensor controlled.Details
remodel (e) kitchen & bathroom in 1018 guerrero.kitchen lighting min 50% of permanent light = high efficacy. bathroom lighting min one high efficacy light. additional high efficacy or vacancy sensor controlled. | $35,000 |
| Nov 12, 2010 | Completed final sign-off Feb 2011 | 1829 37th Av | bathroom remodel- new sink, toilet & shower, no moving or adding walls, provide high efficacy lights per cec 150(k)Details
bathroom remodel- new sink, toilet & shower, no moving or adding walls, provide high efficacy lights per cec 150(k) | $10,000 |
| May 28, 2002 | Expired or cancelled expired Dec 2025 | 1235 03rd Av | add 1 bedroom unit @ g/f, add (n)m bedroom/bath/(n)family room.remodel (e)kitchen/bath, replace (e)Details
add 1 bedroom unit @ g/f, add (n)m bedroom/bath/(n)family room.remodel (e)kitchen/bath, replace (e) | $60,000 |