Stephen Spicer
- Based in
- San Rafael
- On San Francisco permits
- Feb 2003 to Dec 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2017 | Completed final sign-off Feb 2018 | 2190 Broadway | apt 2e: demo (e) master tub / move shower valve / frame & tile new shower in-same place. convert tub to shower & retile.Details
apt 2e: demo (e) master tub / move shower valve / frame & tile new shower in-same place. convert tub to shower & retile. | $15,000 |
| Oct 11, 2016 | Completed final sign-off Feb 2017 | 2190 Broadway | demo (e) cabinets & fixtures/move & add some rough plumbing & electrical/upgrade (e) circuit panel/install (n) cabinets, counters, some appliances/repair floors/trim & paint. no walls moved, removed, added or infilled. all existing layout to remain.Details
demo (e) cabinets & fixtures/move & add some rough plumbing & electrical/upgrade (e) circuit panel/install (n) cabinets, counters, some appliances/repair floors/trim & paint. no walls moved, removed, added or infilled. all existing layout to remain. | $95,000 |
| Oct 10, 2013 | Completed final sign-off Aug 2014 | 1933 Laguna St | phase ii - remodel (e) kitchen & family room. remove (e) bathroom shower and rebuild as vestibule space. net decrease of 8 sq. ft. replace windows and add porch at back of house. phase i work under app# 2013-0927-7943.Details
phase ii - remodel (e) kitchen & family room. remove (e) bathroom shower and rebuild as vestibule space. net decrease of 8 sq. ft. replace windows and add porch at back of house. phase i work under app# 2013-0927-7943. | $95,000 |
| Sep 27, 2013 | Completed final sign-off Jul 2014 | 1933 Laguna St | remodel (e) bathrooms (2 1/2) with added windows. upgrade trim, remodel closet & doorways. electrical, plumbing work. new furnace.Details
remodel (e) bathrooms (2 1/2) with added windows. upgrade trim, remodel closet & doorways. electrical, plumbing work. new furnace. | $90,000 |
| Oct 17, 2012 | Completed final sign-off Dec 2012 | 2442 Polk St | repair dry rot and damaged on exterior stairs, posts and handrails as per housing inspection division. to comply with nov #201255661. less than 50% repair. not visible from street.Details
repair dry rot and damaged on exterior stairs, posts and handrails as per housing inspection division. to comply with nov #201255661. less than 50% repair. not visible from street. | $6,000 |
| Jun 12, 2012 | Completed final sign-off Sep 2012 | 1155 Greenwich St | dry rot repair. scaffolding. dry less than 50%Details
dry rot repair. scaffolding. dry less than 50% | $10,000 |
| Feb 12, 2003 | Expired or cancelled expired Mar 2007 | 3137 Steiner St | addition/revision to app#2003/02/10/7121 fill-in (e)window-not req for light & ventilation not onDetails
addition/revision to app#2003/02/10/7121 fill-in (e)window-not req for light & ventilation not on | $500 |
| Feb 10, 2003 | Expired or cancelled expired Mar 2007 | 3137 Steiner St | demo sheetrock & w.closet wall/repair dryrot & prep for (n)tub & plumbing fixts./add (n) lights.Details
demo sheetrock & w.closet wall/repair dryrot & prep for (n)tub & plumbing fixts./add (n) lights. | $20,000 |