Stephen James Rossi

Contractor license
877762
State license record
Based in
San Francisco
On San Francisco permits
Jul 2024 to Mar 2025
Last 24 months
1 permit filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 1Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 172 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 6, 2025Completed
final sign-off Sep 2025
927 Filbert St929-bath remodel in kind plumbing fixtures/tile/floor/vanity/light 927-bath remodel replace (e) tub w/shower (see plans) remove non load bearing wall & add pocker door, move toilet. both- remove (e) knob & tube wiring, rewire, repair plumbing as necessary, no structural, window opening to remain
Details
Permit
202503061726
Status
complete
Filed
Mar 6, 2025
Permit issued
Mar 6, 2025
Final sign-off
Sep 5, 2025
Declared cost
$40,000
Address
927 Filbert St

929-bath remodel in kind plumbing fixtures/tile/floor/vanity/light 927-bath remodel replace (e) tub w/shower (see plans) remove non load bearing wall & add pocker door, move toilet. both- remove (e) knob & tube wiring, rewire, repair plumbing as necessary, no structural, window opening to remain

Open the permit page

$40,000
Jul 10, 2024Completed
final sign-off Dec 2024
927 Filbert Stremove and replace (12) windows , 6 per unit . opening , locations and ext trim to remain. (10) to be sierra pacific. all wood double hung units. 8 of which partially face street. 2 bath units to be milgard vinyl double hung. 927- 2 kitchen/2 porch/2 hall. 929- 2 kitchen /2 prorch/2 bath
Details
Permit
202407106127
Status
complete
Filed
Jul 10, 2024
Permit issued
Jul 10, 2024
Final sign-off
Dec 17, 2024
Declared cost
$8,500
Address
927 Filbert St

remove and replace (12) windows , 6 per unit . opening , locations and ext trim to remain. (10) to be sierra pacific. all wood double hung units. 8 of which partially face street. 2 bath units to be milgard vinyl double hung. 927- 2 kitchen/2 porch/2 hall. 929- 2 kitchen /2 prorch/2 bath

Open the permit page

$8,500