Back to bathroom remodel contractors
Stein Casey Inc
- Based in
- Ca
- On San Francisco permits
- Mar 2005 to Sep 2015
- Last 24 months
- 0 permits filed
21 permits since 2000: 17 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2009 | Completed final sign-off Aug 2009 | 52 Cumberland St | replace bathroom toilet and sink. replace rear door with lock repair plaster walls. living room 10'x5' bedroom 10'x5' only. cosmetic changes no structural changes.Details
replace bathroom toilet and sink. replace rear door with lock repair plaster walls. living room 10'x5' bedroom 10'x5' only. cosmetic changes no structural changes. | $5,000 |
| Sep 21, 2007 | Completed final sign-off Mar 2008 | 25 Milton St | interior renovation of first floor add master bedroom, laundry, bath renovation.Details
interior renovation of first floor add master bedroom, laundry, bath renovation. | $95,000 |