Back to bathroom remodel contractors
Start 2 Finish Construction
- Based in
- San Lorenzo
- On San Francisco permits
- Apr 2018 to Mar 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 3 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 1 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2024 | Completed final sign-off Apr 2025 | 384 Santa Ana Av | 2nd floor kitchen remodel to include extedn pennisula, change size of window facing side of building, and additional lighting and outlets. master bathtub replace with freestanding tub, add platform, add exhaust fan and an outlet. replace bathroom tub with shower, add an outlet.Details
2nd floor kitchen remodel to include extedn pennisula, change size of window facing side of building, and additional lighting and outlets. master bathtub replace with freestanding tub, add platform, add exhaust fan and an outlet. replace bathroom tub with shower, add an outlet. | $20,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1506 24th Av | in kind remodel (1) kitchen and (1) bathroomDetails
in kind remodel (1) kitchen and (1) bathroom | $65,000 |
| Apr 11, 2018 | Never finaled issued Apr 2018, no final | 815 Haight St | interior renovation and reconfiguration of the 3rd floor master bathroom and laundry area. replace 3rd floor master bedroom windows (2) in the back of the bldgDetails
interior renovation and reconfiguration of the 3rd floor master bathroom and laundry area. replace 3rd floor master bedroom windows (2) in the back of the bldg | $25,000 |