Back to bathroom remodel contractors
Star Light Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Mar 2026
- Last 24 months
- 1 permit filed
17 permits since 2000: 11 completed, 2 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 14 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 44 Dunsmuir St | 1st fl - add 3 bedroom, 3 full bath & family; 2nd fl - legalize full bath. new windows on the side (1st floor).Details
1st fl - add 3 bedroom, 3 full bath & family; 2nd fl - legalize full bath. new windows on the side (1st floor). | $30,000 |
| Dec 30, 2019 | Completed final sign-off Aug 2022 | 90 Dunsmuir St | adu 162-16 including 2 bedrms, living, dining, kitchen & 2 bathrms on 1st fl. removed stairs, relocate kitchen conver existing kitchen & dining to bedrooms, add full bath on 2nd fl, replace water heater & furnace, upgrade electrical & plumbing system.Details
adu 162-16 including 2 bedrms, living, dining, kitchen & 2 bathrms on 1st fl. removed stairs, relocate kitchen conver existing kitchen & dining to bedrooms, add full bath on 2nd fl, replace water heater & furnace, upgrade electrical & plumbing system. | $120,000 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 90 Dunsmuir St | remodel bathroom on 2/f. replace sink and faucet. general bathroom remodel.Details
remodel bathroom on 2/f. replace sink and faucet. general bathroom remodel. | $6,500 |
| May 10, 2019 | Completed final sign-off Nov 2020 | 8 Dunsmuir St | remodel bathroom on 2nd floor. replace bath cabinet and floor tiles only - no other work. no plumbing or electricalDetails
remodel bathroom on 2nd floor. replace bath cabinet and floor tiles only - no other work. no plumbing or electrical | $2,500 |
| Aug 23, 2018 | Completed final sign-off Jul 2020 | 233 02nd Av | stair repair/replacement with new guard rails comply with complaint 20171924. new unit on 1st floor: 1 bedroom and 2 bathroom and family and kitchenDetails
stair repair/replacement with new guard rails comply with complaint 20171924. new unit on 1st floor: 1 bedroom and 2 bathroom and family and kitchen | $140,000 |
| Dec 20, 2017 | Completed final sign-off Jan 2018 | 1259 14th Av | remodel (1) bathroom, replace (e) shower, sink, toilet at 2/f front studio room. no rough framing or change to (e) layout.Details
remodel (1) bathroom, replace (e) shower, sink, toilet at 2/f front studio room. no rough framing or change to (e) layout. | $4,500 |
| Dec 20, 2017 | Completed final sign-off May 2018 | 3121 Turk Bl | remodel (2) kitchen and (1) bathroom, 2&3/f, replace cabinets & countertop. no rough framing or change to (e) layout.Details
remodel (2) kitchen and (1) bathroom, 2&3/f, replace cabinets & countertop. no rough framing or change to (e) layout. | $12,000 |
| Aug 19, 2016 | Completed final sign-off Dec 2016 | 245 Alpha St | construct one bedroom, one full bathroom, family room & legalize one (e) bedroom. all work at ground floor.Details
construct one bedroom, one full bathroom, family room & legalize one (e) bedroom. all work at ground floor. | $42,000 |