Back to bathroom remodel contractors
Spryscapes Const Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Sep 2022
- Last 24 months
- 0 permits filed
222 permits since 2000: 187 completed, 17 never finaled, 18 expired or cancelled.
Of the 17 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 26 completed, 4 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2022 | Completed final sign-off Oct 2023 | 225 Oxford St | remodel (e) upstair bathroom per plan dated 5/16/22: new bathtub, toilet, new custom window for lightwell. not visible from st.Details
remodel (e) upstair bathroom per plan dated 5/16/22: new bathtub, toilet, new custom window for lightwell. not visible from st. | $22,500 |
| Jul 30, 2021 | Completed final sign-off Mar 2022 | 51 Clipper St | interior addition of a 23 sq. ft. 1/2 bath, consisting of a new toilet/vanity w/sink, off central hallway by new door, new exhaust fan, new heat supply diffuser, new tile floor, light & mirror; new waste lines routed down through 1/f to plumbing crawl space inside furred soffit/chase in (e) closetDetails
interior addition of a 23 sq. ft. 1/2 bath, consisting of a new toilet/vanity w/sink, off central hallway by new door, new exhaust fan, new heat supply diffuser, new tile floor, light & mirror; new waste lines routed down through 1/f to plumbing crawl space inside furred soffit/chase in (e) closet | $13,800 |
| Jun 28, 2021 | Completed final sign-off Jul 2022 | 5 Bennington St | amendment to bpa#202007069610. remodel 2/f bathroom, replace sink, bathroom & toilet, add (1) sinkDetails
amendment to bpa#202007069610. remodel 2/f bathroom, replace sink, bathroom & toilet, add (1) sink | $20,000 |
| Jun 28, 2021 | Completed final sign-off Jul 2022 | 5 Bennington St | revision to pa# 202104229159, as per correction notice dated 6/3/2021: rebuild exterior wall at 2nd floor bathroom (approx 12') due to dryrot. also rebuild dining rm wall at bath & bring up to code. replace windows not visible from the street.Details
revision to pa# 202104229159, as per correction notice dated 6/3/2021: rebuild exterior wall at 2nd floor bathroom (approx 12') due to dryrot. also rebuild dining rm wall at bath & bring up to code. replace windows not visible from the street. | $2,500 |
| Jun 18, 2021 | Completed final sign-off Sep 2022 | 58 Idora Av | develop (e) 1st floor storage area into bedroom, bath powder rm & family room. revise (e) internal stairway. add (n) rear deck.Details
develop (e) 1st floor storage area into bedroom, bath powder rm & family room. revise (e) internal stairway. add (n) rear deck. | $180,000 |
| Jul 6, 2020 | Completed final sign-off Jul 2022 | 5 Bennington St | convert part of existing garage into habitable space (new bedroom, bathroom and family). remodel of existing 2nd floor. all work within exisitng bldg envelop.Details
convert part of existing garage into habitable space (new bedroom, bathroom and family). remodel of existing 2nd floor. all work within exisitng bldg envelop. | $150,000 |
| Sep 5, 2019 | Completed final sign-off May 2021 | 2161 20th Av | convert part of (e) garage into habitable space. 2 bedroom 1 full bath 1 laundry rm. replace (e) retaining wall in rear of house. replace (e) foundation as shownDetails
convert part of (e) garage into habitable space. 2 bedroom 1 full bath 1 laundry rm. replace (e) retaining wall in rear of house. replace (e) foundation as shown | $110,000 |
| Jun 4, 2019 | Completed final sign-off Oct 2021 | 2158 29th Av | convert part of garage into habitable space to include full bath, bed & laundry room with direct visual connection. reconfigure existing stairs; new deck at rear of house; replace existing concrete retaining walls in rear yardDetails
convert part of garage into habitable space to include full bath, bed & laundry room with direct visual connection. reconfigure existing stairs; new deck at rear of house; replace existing concrete retaining walls in rear yard | $250,000 |
| Oct 11, 2017 | Completed final sign-off Feb 2018 | 29 Lopez Av | remodel 2nd floor bath - move shower, toilet & add another sink.Details
remodel 2nd floor bath - move shower, toilet & add another sink. | $45,000 |
| Aug 25, 2017 | Completed final sign-off Jul 2019 | 3735 20th St | repair (e) wood framed windows at gront of house; provide new window at level bathroom. repair other windows ash shown in kind.Details
repair (e) wood framed windows at gront of house; provide new window at level bathroom. repair other windows ash shown in kind. | $15,000 |
| Dec 7, 2016 | Never finaled issued Dec 2016, no final | 150 Morningside Dr | bathroom remodel on top floor - move one load-bearing wall, install two new windows at bathroom at rear. windows not visible from street.Details
bathroom remodel on top floor - move one load-bearing wall, install two new windows at bathroom at rear. windows not visible from street. | $80,000 |
| Feb 5, 2016 | Expired or cancelled cancelled Jun 2016 | 120 Mountain Spring Av | renovation of bathroom and insulate adjacent roomDetails
renovation of bathroom and insulate adjacent room | $40,000 |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 2344 Golden Gate Av | dry rot repair in bathroom at #2344.Details
dry rot repair in bathroom at #2344. | $3,000 |
| May 20, 2015 | Completed final sign-off Jul 2015 | 683 07th Av | remodel (1) bathroom & recreation room at top floor and move sink in rec room 6in to right . replace sink & cabinet, retile shower in bathroom.Details
remodel (1) bathroom & recreation room at top floor and move sink in rec room 6in to right . replace sink & cabinet, retile shower in bathroom. | $25,000 |
| Apr 6, 2015 | Never finaled issued Apr 2015, no final | 2929 23rd St | remodel bathroom move non-load bearing wall 12". remodel kitchen:close off 1 door move 1 door 3' in non-load bearing wall.Details
remodel bathroom move non-load bearing wall 12". remodel kitchen:close off 1 door move 1 door 3' in non-load bearing wall. | $25,000 |
| Feb 11, 2015 | Completed final sign-off Oct 2015 | 204 Grand View Av | bathroom remodel - no walls to be moved or removed; replace 1 (e) window in kind in light well; u factor not > .32; to comply with cec150.0(k)5. not visible from street.Details
bathroom remodel - no walls to be moved or removed; replace 1 (e) window in kind in light well; u factor not > .32; to comply with cec150.0(k)5. not visible from street. | $40,000 |
| May 14, 2014 | Completed final sign-off Aug 2014 | 284 Divisadero St | remodel bathroom to include eliminate 1 window, move shower, water closet & sink. replace in kind - no structural workDetails
remodel bathroom to include eliminate 1 window, move shower, water closet & sink. replace in kind - no structural work | $25,000 |
| Jun 27, 2013 | Completed final sign-off Nov 2013 | 50 Lopez Av | renovation of 2 bathrooms on 2nd flr, no walls to be moved, no plansDetails
renovation of 2 bathrooms on 2nd flr, no walls to be moved, no plans | $80,000 |
| Oct 18, 2011 | Completed final sign-off Feb 2012 | 2410 Pacific Av | #9 - renovation of kitchen and bathroom - new dry wall and insulation. all plumbing fixtures remain in same location, move electric range/oven. replace 1 window mx. u factor of 50. lighting to comply with cec 150 (k).Details
#9 - renovation of kitchen and bathroom - new dry wall and insulation. all plumbing fixtures remain in same location, move electric range/oven. replace 1 window mx. u factor of 50. lighting to comply with cec 150 (k). | $70,000 |
| Sep 28, 2011 | Completed final sign-off Dec 2011 | 300 Funston Av | 1st floor bath - remove one toilet & install shower & lav. change of use pa #201011235582.Details
1st floor bath - remove one toilet & install shower & lav. change of use pa #201011235582. | $10,000 |
| Jul 13, 2010 | Completed final sign-off Apr 2011 | 130 Vasquez Av | renovate kitchen, remove and add windows, renovate bathroom, renovate front entry, renovate fireplace and change existing windowsDetails
renovate kitchen, remove and add windows, renovate bathroom, renovate front entry, renovate fireplace and change existing windows | $150,000 |
| Feb 1, 2010 | Completed final sign-off Feb 2011 | 242 Anderson St | renovate main bathroom-demo to studs, remove tub & install shower & add fan, replace all fixtures, locations to remain the same, no moving or adding wallsDetails
renovate main bathroom-demo to studs, remove tub & install shower & add fan, replace all fixtures, locations to remain the same, no moving or adding walls | $30,000 |
| May 11, 2009 | Completed final sign-off Aug 2009 | 2410 Pacific Av | remodel bathroomDetails
remodel bathroom | $30,000 |
| Dec 11, 2007 | Completed final sign-off Jun 2008 | 2539 34th Av | legalize unwarranted room with full bathroom, add laundry room with sink, add new counter & sink. install bolts and plywood in garage.Details
legalize unwarranted room with full bathroom, add laundry room with sink, add new counter & sink. install bolts and plywood in garage. | $60,000 |
| Jun 14, 2006 | Expired or cancelled expired Oct 2010 | 1670 08th Av | renovate 2nd fl bathroom in existing space no change to partitions on windows. reapir south side wall dryrot. install shower where tub was.Details
renovate 2nd fl bathroom in existing space no change to partitions on windows. reapir south side wall dryrot. install shower where tub was. | $26,000 |
| Oct 25, 2005 | Completed final sign-off May 2006 | 2546 22nd Av | open 1 kitchen wall,remodel bathroom at 1/f. alteration to (e) kitchen.Details
open 1 kitchen wall,remodel bathroom at 1/f. alteration to (e) kitchen. | $50,000 |
| Oct 18, 2005 | Completed final sign-off Mar 2006 | 1655 33rd Av | legalize bedroom,bath,laundry on 1/f per compliant #200344738Details
legalize bedroom,bath,laundry on 1/f per compliant #200344738 | $4,000 |
| Feb 7, 2005 | Completed final sign-off Mar 2005 | 3959 20th St | remodel first floor bathDetails
remodel first floor bath | $9,000 |
| Jul 8, 2003 | Never finaled issued Jul 2003, no final | 2227 Santiago St | remodel upstairs bathr and install 1/2 bath in garageDetails
remodel upstairs bathr and install 1/2 bath in garage | $40,000 |
| Jun 23, 2003 | Completed final sign-off Feb 2004 | 56 25th Av | remodel 1 bathroom on 2nd floorDetails
remodel 1 bathroom on 2nd floor | $40,000 |
| Mar 25, 2003 | Completed final sign-off Aug 2003 | 162 10th Av | construct 1/2 of bsmnt into recroom and install full bathDetails
construct 1/2 of bsmnt into recroom and install full bath | $60,000 |
| Apr 23, 2001 | Expired or cancelled expired Oct 2001 | 56 25th Av | remodle 2 bathrooms (2nd & 3rd fl)Details
remodle 2 bathrooms (2nd & 3rd fl) | $25,000 |
| Jan 12, 2001 | Completed final sign-off Feb 2001 | 554 27th Av | install 1/2 bath in garageDetails
install 1/2 bath in garage | $12,000 |