Back to bathroom remodel contractors
Springs Construction
- Based in
- Redwood City
- On San Francisco permits
- Jun 2000 to May 2021
- Last 24 months
- 0 permits filed
44 permits since 2000: 33 completed, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 never finaled. Typically 0 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2021 | Completed final sign-off Aug 2024 | 4758 17th St | interior remodel including all rooms. 2 bedrooms, 2 bathrooms, new kitchen, new central partition structural support.Details
interior remodel including all rooms. 2 bedrooms, 2 bathrooms, new kitchen, new central partition structural support. | $200,000 |
| Nov 27, 2018 | Completed final sign-off Mar 2022 | 2575 28th Av | addition at rear of bld 9'-10" < 2 stories. reconfigure ground floor rooms (3) & full bath. 2nd flr interior remodel. kitchen & 2 baths. new electrical, rewire to code. tankless water heater. replace front window (in opening)& garage door. replace sewer lateral.Details
addition at rear of bld 9'-10" < 2 stories. reconfigure ground floor rooms (3) & full bath. 2nd flr interior remodel. kitchen & 2 baths. new electrical, rewire to code. tankless water heater. replace front window (in opening)& garage door. replace sewer lateral. | $265,000 |
| Apr 24, 2014 | Completed final sign-off Mar 2015 | 83 Encanto Av | adding game room, guest bedroom,a full bathroom and washer and dryer on 1st floor. remodel kitchen and 2 bathrooms on 2nd floor. adding retaining wall at rear of house to create new conc. patio.new radiant heating system and new 6 ext. windows and 1 door at the rear of the house per plan.Details
adding game room, guest bedroom,a full bathroom and washer and dryer on 1st floor. remodel kitchen and 2 bathrooms on 2nd floor. adding retaining wall at rear of house to create new conc. patio.new radiant heating system and new 6 ext. windows and 1 door at the rear of the house per plan. | $350,000 |
| Nov 20, 2012 | Completed final sign-off Jan 2013 | 1310 Fillmore St | accessible bath remodel. remodel tub and rplace with roll in shower. remove vanity and replace with console sink, replace toiletDetails
accessible bath remodel. remodel tub and rplace with roll in shower. remove vanity and replace with console sink, replace toilet | $6,000 |
| Jun 23, 2011 | Completed final sign-off Mar 2012 | 1700 Page St | fire damage repair. comply with nov #201108424 and correct as neccessary in unit 7 and other affected areas:1,2,5,6,7,8,:replace finishes with like kind and quality, remodel bathrooms & kitchens damaged by fire. reciept # bid 00192. fire alarm under seperate permit.Details
fire damage repair. comply with nov #201108424 and correct as neccessary in unit 7 and other affected areas:1,2,5,6,7,8,:replace finishes with like kind and quality, remodel bathrooms & kitchens damaged by fire. reciept # bid 00192. fire alarm under seperate permit. | $130,000 |
| May 11, 2009 | Never finaled issued May 2009, no final | 1525 Beach St | revision to 20005202518: relocate 2 baths, remodel 1 bath. add 1 new bedroom, glass block windows, new rear french doors.Details
revision to 20005202518: relocate 2 baths, remodel 1 bath. add 1 new bedroom, glass block windows, new rear french doors. | $100,000 |
| Oct 2, 2006 | Completed final sign-off Mar 2007 | 464 Hazelwood Av | master suite remodeling, bathroom remodeling, plumbing, electrical, insulation, windows, dry wallDetails
master suite remodeling, bathroom remodeling, plumbing, electrical, insulation, windows, dry wall | $30,000 |
| Jul 26, 2006 | Never finaled issued Jun 2007, no final | 1606 Shafter Av | legalize bedroom and bathroom in the lower level. partial upgrade of the lateral systemDetails
legalize bedroom and bathroom in the lower level. partial upgrade of the lateral system | $10,000 |
| Dec 5, 2005 | Completed final sign-off Mar 2006 | 150 Valley St | create 2nd bathroom at present laundry, move laundry to kitchen, reconfigure two closets - work done on 2nd floorDetails
create 2nd bathroom at present laundry, move laundry to kitchen, reconfigure two closets - work done on 2nd floor | $33,000 |
| Jul 22, 2005 | Completed final sign-off Jan 2006 | 33 Teddy Av | fire damage repair-framing,siding drywall, roofing. roofing rafters over the bathroom, approx area 2Details
fire damage repair-framing,siding drywall, roofing. roofing rafters over the bathroom, approx area 2 | $40,000 |
| Jan 22, 2004 | Completed final sign-off Aug 2004 | 6518 03rd St | replace drywall electrical wiring,tub,2 sinks,cabinets,paint,carpet,repair roof,remodel ktichen/bathDetails
replace drywall electrical wiring,tub,2 sinks,cabinets,paint,carpet,repair roof,remodel ktichen/bath | $67,000 |
| Nov 8, 2001 | Completed final sign-off Apr 2003 | 10 Palos Pl | remodel kitchen, demo office/bathrm, replace w/family room, 1/2 bath, horiz. additionDetails
remodel kitchen, demo office/bathrm, replace w/family room, 1/2 bath, horiz. addition | $120,000 |
| Jul 24, 2001 | Completed final sign-off Feb 2002 | 55 Santa Clara Av | hall bathroom upgrade, new title fl & tubDetails
hall bathroom upgrade, new title fl & tub | $15,000 |