Back to bathroom remodel contractors
Spire Architecture Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2014 to Oct 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 1 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2014 | Never finaled issued Oct 2014, no final | 30 Presidio Tr | repair/rebuild existing ceiling on 3rd floor exercise room; install/build new bathroom at basement level ( new shower, new sink, new toilet & finish materials).Details
repair/rebuild existing ceiling on 3rd floor exercise room; install/build new bathroom at basement level ( new shower, new sink, new toilet & finish materials). | $20,000 |