Back to bathroom remodel contractors
Spiers & Sons Inc
- Based in
- San Bruno
- On San Francisco permits
- Oct 2020 to Aug 2026
- Last 24 months
- 7 permits filed
15 permits since 2000: 13 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 in progress. Typically 72 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2026 | In progress issued Sep 2026 | 1459 34th Av | new bedroom & bathroom at (e), non-habitable first floor space. new stairway & bathroom alterations at second floor.Details
new bedroom & bathroom at (e), non-habitable first floor space. new stairway & bathroom alterations at second floor. | $150,000 |
| May 29, 2025 | Completed final sign-off Feb 2026 | 1620 Dolores St | convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom.Details
convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom. | $40,000 |
| Feb 11, 2025 | Completed final sign-off Jun 2026 | 900 Plymouth Av | erect a type vb, one story, detached adu building with one bedroom, one bathroom.Details
erect a type vb, one story, detached adu building with one bedroom, one bathroom. | $73,723 |
| Nov 12, 2024 | Completed final sign-off Jan 2026 | 2768 Diamond St | interior renovation of 2nd and 3rd floor; addition of 3 (n) dormers at 3rd floor roof; creation of new bathroom and bedroom.Details
interior renovation of 2nd and 3rd floor; addition of 3 (n) dormers at 3rd floor roof; creation of new bathroom and bedroom. | $110,000 |
| Oct 16, 2024 | Completed final sign-off Jun 2026 | 354 Hearst Av | remodel of ground flr space to include 537 sqft of new habitable space playroom (not for sleeping) and a new bathroom.Details
remodel of ground flr space to include 537 sqft of new habitable space playroom (not for sleeping) and a new bathroom. | $175,000 |
| Feb 5, 2024 | Completed final sign-off Jun 2024 | 1405 07th Av | remodel (1) bathroom in kind. no wall removal or structual work. replacing tile, fixtures and finishes and sheetrock. install exhaust fan.Details
remodel (1) bathroom in kind. no wall removal or structual work. replacing tile, fixtures and finishes and sheetrock. install exhaust fan. | $35,000 |
| Jan 4, 2021 | Completed final sign-off Jun 2021 | 2119 Jones St | remodel one bathroom in-kind like for like.Details
remodel one bathroom in-kind like for like. | $25,000 |
| Nov 21, 2020 | Completed final sign-off Aug 2021 | 379 Winding Wy | bathroom remodel & reconfigurationDetails
bathroom remodel & reconfiguration | $25,000 |