Back to bathroom remodel contractors
Spellbound Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2008 to Aug 2023
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2023 | Completed final sign-off Mar 2024 | 75 Yerba Buena Av | primary (one) bathroom remodel. replace in kind.Details
primary (one) bathroom remodel. replace in kind. | $25,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2021 | 3350 Divisadero St | remodel in kind 2 bathrooms. install new doors. install new carpet and flooring. misc finish work. install new fixtures existing. working only on 2nd floor replacement <in-kind> in weight and area.Details
remodel in kind 2 bathrooms. install new doors. install new carpet and flooring. misc finish work. install new fixtures existing. working only on 2nd floor replacement <in-kind> in weight and area. | $40,000 |
| Oct 6, 2020 | Completed final sign-off Dec 2020 | 2944 Divisadero St | bathroom remodel - nbew shower/vanity/lighting/fixtures/tile, new tile floor in 1/2 bathDetails
bathroom remodel - nbew shower/vanity/lighting/fixtures/tile, new tile floor in 1/2 bath | $25,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2017 | 301 Bryant St | unit #403: bathroom (2) and kitchen remodel - new tile & fixtures. new kitchen cabniets and appliances, new tile, upgrade electrical device & fixture. no structure workDetails
unit #403: bathroom (2) and kitchen remodel - new tile & fixtures. new kitchen cabniets and appliances, new tile, upgrade electrical device & fixture. no structure work | $80,000 |
| Jul 10, 2014 | Expired or cancelled expired Nov 2017 | 189 06th Av | change of use from vacant retail to limited restaurant. remodel of (e) bathroom to make it ada compliant, plumbing & electrical work. interior t.i. workDetails
change of use from vacant retail to limited restaurant. remodel of (e) bathroom to make it ada compliant, plumbing & electrical work. interior t.i. work | $40,000 |
| May 14, 2014 | Completed final sign-off Feb 2015 | 101 States St | unit 2- remodel bathroom replace all fixtures in same locationss; replace sliding door/ rear door/ bathroom window u factor of .4; new hardwood flooring on 2/f/ re-finish (e) hardwood on 1/f; install recessed can lightings/ lower bay window framing/ paint interior/ misc. rot repair,Details
unit 2- remodel bathroom replace all fixtures in same locationss; replace sliding door/ rear door/ bathroom window u factor of .4; new hardwood flooring on 2/f/ re-finish (e) hardwood on 1/f; install recessed can lightings/ lower bay window framing/ paint interior/ misc. rot repair, | $68,000 |
| Mar 6, 2012 | Completed final sign-off Aug 2012 | 301 Bryant St | 1 bathroom remodel. new tile/fixtures/glass in shower. reuse extg 1 piece stone pan. new countertop/misc painting/etcDetails
1 bathroom remodel. new tile/fixtures/glass in shower. reuse extg 1 piece stone pan. new countertop/misc painting/etc | $10,000 |
| Jun 14, 2011 | Completed final sign-off Sep 2011 | 301 Bryant St | unit #603 remodel bathroom; bath 1 - new tile/shower valve/frameless glass door. bath 2- new tub/new tile/shower valve/frameless glass screen.Details
unit #603 remodel bathroom; bath 1 - new tile/shower valve/frameless glass door. bath 2- new tub/new tile/shower valve/frameless glass screen. | $10,000 |
| Apr 21, 2011 | Completed final sign-off Aug 2011 | 12 Sharp Pl | bath addition/reconfigure closet/move waterheater double pane window inserts @ basement (lowest level).Details
bath addition/reconfigure closet/move waterheater double pane window inserts @ basement (lowest level). | $26,000 |
| May 4, 2010 | Completed final sign-off Apr 2011 | 2333 Octavia St | replace 30 windows ( front, side and rear) and sliding doors (3). remodel 3 baths and one powder rm, new tile and fixtures. relocate laundry rm. replace carpet. no struc. work. add w/d to bedrm.Details
replace 30 windows ( front, side and rear) and sliding doors (3). remodel 3 baths and one powder rm, new tile and fixtures. relocate laundry rm. replace carpet. no struc. work. add w/d to bedrm. | $100,000 |
| Mar 18, 2008 | Completed final sign-off May 2008 | 1568 36th Av | bathroom remodel. new bath tub (jacuzzi type) with tiled surround new varity cabinet w/ 2 sinks, new toiledt, double replacement windows (2), new head/fan/light, new tile floor. wainscot, new bathroom dedicated circuit, painting, finish work. windows u-factor < 0.67Details
bathroom remodel. new bath tub (jacuzzi type) with tiled surround new varity cabinet w/ 2 sinks, new toiledt, double replacement windows (2), new head/fan/light, new tile floor. wainscot, new bathroom dedicated circuit, painting, finish work. windows u-factor < 0.67 |