Sparkpro Electric
- Based in
- Oakland
- On San Francisco permits
- Oct 2026 to Nov 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 1243 38th Av | solar permit: ballasted: n, including 1 energy storage unit, with 7 kwh each in capacity, ess units will not be closer than 3 feet | ess installDetails
solar permit: ballasted: n, including 1 energy storage unit, with 7 kwh each in capacity, ess units will not be closer than 3 feet | ess install | $2,000 |
| Oct 15, 2026 | In progress filed Oct 2026, not yet issued | 4121 23rd St | solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 12.3 kwh each in capacity, ess units will be closer than 3 feet | ess installation: install anker solix power dock ax170 with a new eaton 200a main breaker, ahead of the existing 200a sqDetails
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 12.3 kwh each in capacity, ess units will be closer than 3 feet | ess installation: install anker solix power dock ax170 with a new eaton 200a main breaker, ahead of the existing 200a sq | $4,000 |