Back to bathroom remodel contractors
Sp Carpet Pros Inc
- Based in
- Foster City
- On San Francisco permits
- Aug 2007 to Sep 2010
- Last 24 months
- 0 permits filed
40 permits since 2000: 32 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 never finaled. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2010 | Completed final sign-off Oct 2010 | 1900 Lyon St | remodel bathroom, replace bath tub & tile tub walls, replace bath fan vent, replace vanity, replace tile area 8x5. fan connect to exsiting duct. high efficacy lighting or occupancy sensor.Details
remodel bathroom, replace bath tub & tile tub walls, replace bath fan vent, replace vanity, replace tile area 8x5. fan connect to exsiting duct. high efficacy lighting or occupancy sensor. | $8,000 |
| Jan 28, 2010 | Completed final sign-off Jul 2010 | 789 48th Av | upstairs bathroom remodel: upgrade electrical in compliance w/ title24. install pressure balance valve. (n) tub, vanity w/ all (n) plumbing connections @ (e) locations. tile floor & walls. no structrural changes. downstairs bathroom: install (n) plumbing & supply & drain lines toilet/shower/sink,Details
upstairs bathroom remodel: upgrade electrical in compliance w/ title24. install pressure balance valve. (n) tub, vanity w/ all (n) plumbing connections @ (e) locations. tile floor & walls. no structrural changes. downstairs bathroom: install (n) plumbing & supply & drain lines toilet/shower/sink, | $42,000 |
| Nov 24, 2009 | Completed final sign-off Apr 2011 | 1068 14th St | 2 bathroom remodels. includes rough plumbing, relocate toilets, tub, shower, vanities, lighting, gfci, exhaust fans, motion sensor for main light. hot mop shower panDetails
2 bathroom remodels. includes rough plumbing, relocate toilets, tub, shower, vanities, lighting, gfci, exhaust fans, motion sensor for main light. hot mop shower pan | $32,000 |
| Oct 22, 2009 | Never finaled issued Oct 2009, no final | 184 Marview Wy | bathroom remodel: remove and replace shower pan/toilet, & vanity. in same location, hot mop shower pan. install pressure balance valve shower and new faucet & p trap vanity. tile floor and replace gfci outlet. no structural changes.Details
bathroom remodel: remove and replace shower pan/toilet, & vanity. in same location, hot mop shower pan. install pressure balance valve shower and new faucet & p trap vanity. tile floor and replace gfci outlet. no structural changes. | $11,000 |
| Oct 6, 2009 | Completed final sign-off Oct 2009 | 1921 Jefferson St | unit 306 - bathroom remodel - install pressure balance volve shower. install new vanity sink & faucet (e) location. install gfci outlet & motion sensor light switche (e) location. no structural changes.Details
unit 306 - bathroom remodel - install pressure balance volve shower. install new vanity sink & faucet (e) location. install gfci outlet & motion sensor light switche (e) location. no structural changes. | $5,000 |
| Jun 30, 2009 | Never finaled issued Jun 2009, no final | 1372 Broadway | master bath remodel. install new tub ceiling fan / light. pressure balance value. re-install toilet (e) location. install new sink & faucet.Details
master bath remodel. install new tub ceiling fan / light. pressure balance value. re-install toilet (e) location. install new sink & faucet. | $10,000 |
| Nov 17, 2008 | Completed final sign-off Mar 2009 | 416 Molimo Dr | bathroom remodel: install new air tub at (e) location, new toilet at (e) location. move vanity and utilize (e0dwv install gfci outlets. tile floor & shower/tub walls. install flour. light or motion sensor switch in compliance w/title 24.Details
bathroom remodel: install new air tub at (e) location, new toilet at (e) location. move vanity and utilize (e0dwv install gfci outlets. tile floor & shower/tub walls. install flour. light or motion sensor switch in compliance w/title 24. | $11,000 |
| May 27, 2008 | Completed final sign-off Mar 2009 | 1177 California St | work @ unit# 1402 only. kitchen & bathroom remodel. kitchen. remove & replace cabinets. all appliances & fixtures to remain in (e) location. bathroom: install pressure balance valve. remove & replace vanity same location (install shutt off valve for unit) install new tile over existing tub.Details
work @ unit# 1402 only. kitchen & bathroom remodel. kitchen. remove & replace cabinets. all appliances & fixtures to remain in (e) location. bathroom: install pressure balance valve. remove & replace vanity same location (install shutt off valve for unit) install new tile over existing tub. | $15,000 |