Southern Cross Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to May 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 12 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2024 | Completed final sign-off Oct 2024 | 554 Moultrie St | ref to pa #202010035852. added concrete foundation drawings per field inspector to show (n) ftg supporting entry stairs.Details
ref to pa #202010035852. added concrete foundation drawings per field inspector to show (n) ftg supporting entry stairs. | |
| Mar 7, 2019 | Completed final sign-off Oct 2019 | 309 Chestnut St | structural rev to bpa #201811135694. move uncovered structural post & replace w/steel 3"x4" post on new 39"x39"x12" footing. sister (e) 6x8 beam with (2) lvl 1-3/4"-7 1/2". remove (e) unacceptable floor structure with new 2"x8" joist 16"o.c to ledgers (e) walls. cover with 3/4" cdx plywood/10d 6"o.cDetails
structural rev to bpa #201811135694. move uncovered structural post & replace w/steel 3"x4" post on new 39"x39"x12" footing. sister (e) 6x8 beam with (2) lvl 1-3/4"-7 1/2". remove (e) unacceptable floor structure with new 2"x8" joist 16"o.c to ledgers (e) walls. cover with 3/4" cdx plywood/10d 6"o.c | $1,000 |
| Nov 13, 2018 | Completed final sign-off Oct 2019 | 309 Chestnut St | remodel (e) ground floor rear apartment area within the (e) apartment area and the building footprint. no work facing chestnut stDetails
remodel (e) ground floor rear apartment area within the (e) apartment area and the building footprint. no work facing chestnut st | $30,000 |
| Oct 4, 2018 | Completed final sign-off Jan 2019 | 2828 Pacheco St | remodel existing bathroom downstairs- new toilet, new shower pan, new lighting, new plumbing fixtrue throughout remodel. no change in wall, openings and layoutDetails
remodel existing bathroom downstairs- new toilet, new shower pan, new lighting, new plumbing fixtrue throughout remodel. no change in wall, openings and layout | $20,000 |
| Jun 16, 2016 | Completed final sign-off Oct 2019 | 309 Chestnut St | addition of family room on 2nd flr over existing. study on the first floor. the space is currently a deck.Details
addition of family room on 2nd flr over existing. study on the first floor. the space is currently a deck. | $15,000 |
| Jun 10, 2016 | Completed final sign-off Dec 2016 | 239 Brannan St | kitchen remodel. n/a for maher.Details
kitchen remodel. n/a for maher. | $36,000 |
| Nov 20, 2014 | Completed final sign-off May 2015 | 216 Kenwood Wy | new bathroom in (e) space in the above garage level; maher n/aDetails
new bathroom in (e) space in the above garage level; maher n/a | $10,000 |
| Nov 7, 2014 | Completed final sign-off May 2015 | 216 Kenwood Wy | dry rot repair front south side aprox 200 sq ft stucco in kind. above entry stairs around windows.Details
dry rot repair front south side aprox 200 sq ft stucco in kind. above entry stairs around windows. | $3,000 |
| Nov 21, 2012 | Completed final sign-off Jun 2013 | 609 Carolina St | replace (e) kitchen and 2 bath cabinetry, new lighting, kitchen appliances, upgrade electrical to code, new surface counters, new shower stall, new tile, new flooring, new bath exhaust fans, new microwave/hood combo. all to be connected to existing ducts.Details
replace (e) kitchen and 2 bath cabinetry, new lighting, kitchen appliances, upgrade electrical to code, new surface counters, new shower stall, new tile, new flooring, new bath exhaust fans, new microwave/hood combo. all to be connected to existing ducts. | $25,000 |
| Sep 7, 2011 | Completed final sign-off Apr 2012 | 309 Chestnut St | unit #309 - remodel bathroom, no changes in size of building envelope, no new unconditional space, no exterior work.Details
unit #309 - remodel bathroom, no changes in size of building envelope, no new unconditional space, no exterior work. | $10,000 |
| Jan 7, 2008 | Completed final sign-off Jan 2008 | 45 Southern Heights Av | renew app #200704239454 and 200703085775 for final inspectionDetails
renew app #200704239454 and 200703085775 for final inspection | |
| Apr 23, 2007 | Expired or cancelled expired Jan 2008 | 45 Southern Heights Av | remodel bathroom using new fixture & finish materials. present renovation in process. reference pa# 2007/03/08/5775.Details
remodel bathroom using new fixture & finish materials. present renovation in process. reference pa# 2007/03/08/5775. | $15,000 |
| Mar 29, 2002 | Completed final sign-off Aug 2002 | 2246 31st Av | repalce extg windows/remodel bthrm/rplc wood siding with vynal at rear of house/paintDetails
repalce extg windows/remodel bthrm/rplc wood siding with vynal at rear of house/paint | $40,000 |