Back to bathroom remodel contractors
Sonoma Build Group Inc
- Based in
- Glen Ellen
- On San Francisco permits
- Dec 2018 to Aug 2026
- Last 24 months
- 37 permits filed
62 permits since 2000: 40 completed, 18 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 12 completed, 7 in progress, 3 expired or cancelled. Typically 6 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 511 Scott St | unit 11-to legalize (e) unpermitted bathroomDetails
unit 11-to legalize (e) unpermitted bathroom | $24,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 380 Union St | unit a rear bldg: remodel middle unit bathroom in kind, kitchen and laundry room remodel in kind, new recessed lights. update plumbing and electrical.Details
unit a rear bldg: remodel middle unit bathroom in kind, kitchen and laundry room remodel in kind, new recessed lights. update plumbing and electrical. | $43,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 380 Union St | unit c rear bldg: remodel bathroom in kind, add recessed lights to living room. update plumbing and electrical as needed.Details
unit c rear bldg: remodel bathroom in kind, add recessed lights to living room. update plumbing and electrical as needed. | $15,000 |
| Jun 4, 2026 | In progress issued Sep 2026 | 1945 Lyon St | infill rear yard 12" h, new 50 sq ft deck for unit 1953. new exclusive 628 sq ft roof decks for units 1949 and 1951. 2/f: reconfigure kithcen and bathroom, (n) 50 sq ft slide deck. 3/f: reconfigure rear floor plans, exterior stairs to roof deck and 2/f windows.Details
infill rear yard 12" h, new 50 sq ft deck for unit 1953. new exclusive 628 sq ft roof decks for units 1949 and 1951. 2/f: reconfigure kithcen and bathroom, (n) 50 sq ft slide deck. 3/f: reconfigure rear floor plans, exterior stairs to roof deck and 2/f windows. | $12,000 |
| May 15, 2026 | Completed final sign-off Oct 2026 | 380 Union St | unit 380b (rear building): remodel in kind kitchen, laundry, and bathroom. new kitchen cabinets, countertops,and fixtures.Details
unit 380b (rear building): remodel in kind kitchen, laundry, and bathroom. new kitchen cabinets, countertops,and fixtures. | $50,000 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 376 Union St | new aluminum clad front window front builing. unit 378 3rd flr. remove wall between living room and bedroom. unit 380 fourth floor: remove wall between living room and office, expand powder room to full bath.Details
new aluminum clad front window front builing. unit 378 3rd flr. remove wall between living room and bedroom. unit 380 fourth floor: remove wall between living room and office, expand powder room to full bath. | $65,300 |
| Feb 26, 2026 | Expired or cancelled cancelled Jul 2026 | 1945 Lyon St | -units 1945 and 1955: remodel in kind (2) units. remove finishes, and sheetrock. remove water damaged sheetrock in garage and replace in kind. remodel bathrooms and kitchens in kind. no wall removal or layout change.Details
-units 1945 and 1955: remodel in kind (2) units. remove finishes, and sheetrock. remove water damaged sheetrock in garage and replace in kind. remodel bathrooms and kitchens in kind. no wall removal or layout change. | $45,000 |
| Feb 19, 2026 | Completed final sign-off Jul 2026 | 376 Union St | front building unit 376- remodel in kind bathroom and laundry (n) kitchen cabinets, countertops and fixturesDetails
front building unit 376- remodel in kind bathroom and laundry (n) kitchen cabinets, countertops and fixtures | $27,000 |
| Feb 18, 2026 | Completed final sign-off Jul 2026 | 380 Union St | front building unit 380- remodel in kind bathroom and laundry (n) kitchen cabinets, countertops and fixturesDetails
front building unit 380- remodel in kind bathroom and laundry (n) kitchen cabinets, countertops and fixtures | $27,000 |
| Jan 29, 2026 | Expired or cancelled cancelled Jul 2026 | 1945 Lyon St | unit 1947 and 1953- remodel in kind to include bathrooms and kitchen remodel like for like. no wall removal or layout changes.Details
unit 1947 and 1953- remodel in kind to include bathrooms and kitchen remodel like for like. no wall removal or layout changes. | $160,000 |
| Aug 12, 2025 | In progress issued Aug 2025 | 2929 Clay St | 1/fl- infill (e) deck to (n) family room, remodel (e) bath, (n) kitchenette. replace in kind (e) pergola, rear decks, stairs handrails and guardrails throughout first -third floorDetails
1/fl- infill (e) deck to (n) family room, remodel (e) bath, (n) kitchenette. replace in kind (e) pergola, rear decks, stairs handrails and guardrails throughout first -third floor | $72,525 |
| Nov 6, 2024 | Expired or cancelled expired Jan 2026 | 2955 Sacramento St | rev 202209212825- first floor - horizontal addition of 210sf and relocation of bathroom sink. second floor- (n) 197 sf roof deck at rearDetails
rev 202209212825- first floor - horizontal addition of 210sf and relocation of bathroom sink. second floor- (n) 197 sf roof deck at rear | |
| Aug 22, 2024 | In progress issued Feb 2025 | 2929 Clay St | 1/f: (n) bath and storage, (n) front entry window and door. 2/f: kitchen remodel, removal of fireplace and addition of new closets in bedroom. 3/f: kitchen and bathroom remodel, removal of fireplace and addition of (n) closets in bedroom.Details
1/f: (n) bath and storage, (n) front entry window and door. 2/f: kitchen remodel, removal of fireplace and addition of new closets in bedroom. 3/f: kitchen and bathroom remodel, removal of fireplace and addition of (n) closets in bedroom. | $87,300 |
| Jan 23, 2024 | Completed final sign-off Apr 2024 | 2125 Greenwich St | non structural remodel. new bathroom and closet on 2/f. new bathroom on 3/f. new closet on 4/fDetails
non structural remodel. new bathroom and closet on 2/f. new bathroom on 3/f. new closet on 4/f | $63,225 |
| Jan 23, 2024 | Completed final sign-off Dec 2024 | 3140 Lyon St | non structural remodel. remodel e bath on 1st fl. replace e vanity and floor tile in kind 2nd fl. add new bi fold door to pantry. expanion of new master closet and master bath on 3rd fl.Details
non structural remodel. remodel e bath on 1st fl. replace e vanity and floor tile in kind 2nd fl. add new bi fold door to pantry. expanion of new master closet and master bath on 3rd fl. | $77,327 |
| Jan 10, 2024 | In progress issued Jan 2024 | 2260 Jackson St | remodel in kind: kitchen, bathroom, powder room.Details
remodel in kind: kitchen, bathroom, powder room. | $73,756 |
| Jan 4, 2024 | Completed final sign-off Jul 2024 | 2655 Clay St | remove chimney. add (n) half bath on second floor. expand master bathroom and (e) master closet by moving and interior - non bearing wall. (ref# 202312223038)Details
remove chimney. add (n) half bath on second floor. expand master bathroom and (e) master closet by moving and interior - non bearing wall. (ref# 202312223038) | $57,600 |
| Dec 22, 2023 | Completed final sign-off Oct 2025 | 2655 Clay St | remodel in kind 1/2 bath on main floor. master bath on second floor master bedroom closet and kitchen and kitchen island all in kindDetails
remodel in kind 1/2 bath on main floor. master bath on second floor master bedroom closet and kitchen and kitchen island all in kind | $40,000 |
| Dec 6, 2023 | Completed final sign-off Dec 2024 | 3140 Lyon St | remodel in kind for master bath, hallway full bath, hallway laundry on 2nd floor.Details
remodel in kind for master bath, hallway full bath, hallway laundry on 2nd floor. | $34,000 |
| Aug 29, 2023 | Completed final sign-off Sep 2024 | 2008 Vallejo St | revision to 201902142937. 1st/f: in -fill convered porch to expand (e) family rm. 2nd/f: relocate powder rm & n wet bar. 3rd/f: reconfiguration of stairs to penthouse & (n) bathroom, 4th/f: (n) elevator access & relocation of bathroom. update window & door sizes & locations thru outDetails
revision to 201902142937. 1st/f: in -fill convered porch to expand (e) family rm. 2nd/f: relocate powder rm & n wet bar. 3rd/f: reconfiguration of stairs to penthouse & (n) bathroom, 4th/f: (n) elevator access & relocation of bathroom. update window & door sizes & locations thru out | $40,000 |
| Mar 26, 2021 | Completed final sign-off Dec 2025 | 324 Collingwood St | reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub.Details
reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub. | $25,000 |
| Feb 14, 2019 | Completed final sign-off Sep 2024 | 2008 Vallejo St | remodel of all fls: new elevator. 1/f: new bedroom, bath, powder room, laundry and 2 closets, wine celler. 2/f: new poweder room & 2 closets. 3/f: new master bath, bedroom, closet and bath. 4/f: new bath, new roof deck.Details
remodel of all fls: new elevator. 1/f: new bedroom, bath, powder room, laundry and 2 closets, wine celler. 2/f: new poweder room & 2 closets. 3/f: new master bath, bedroom, closet and bath. 4/f: new bath, new roof deck. | $100,000 |