Back to bathroom remodel contractors
Solstice Construction
- Based in
- Oakland
- On San Francisco permits
- Jul 2008 to Jul 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2008 | Completed final sign-off Oct 2008 | 1715 Green St | laundry and bath remodel, change wall configuration to accomodate double door into laundry room and n sink with cabinet location for toilet room. change location of hot/cold line water line and drain.new fixtures and flooring.Details
laundry and bath remodel, change wall configuration to accomodate double door into laundry room and n sink with cabinet location for toilet room. change location of hot/cold line water line and drain.new fixtures and flooring. | $5,000 |