Solis Lighting And Electrical Services
- Based in
- San Clemente
- On San Francisco permits
- May 2023 to May 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2023 | Never finaled filed May 2023, never issued | 491 Bay Shore Bl | replacing existing parking lot lightpole mounted lighting fixtures in an existing lowes retail store. replacing the existing pole-mounted lighting fixtures only. no new poles or additional lighting fixtures proposed.Details
replacing existing parking lot lightpole mounted lighting fixtures in an existing lowes retail store. replacing the existing pole-mounted lighting fixtures only. no new poles or additional lighting fixtures proposed. | $25,000 |