Solid Design Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2013 to Dec 2025
- Last 24 months
- 1 permit filed
15 permits since 2000: 9 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 29 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2023 | Completed final sign-off Jan 2024 | 14 Ney St | repair water damage at flooring, windows, and siding at back deck (non frontage). repair in kind. provide shoring as required.Details
repair water damage at flooring, windows, and siding at back deck (non frontage). repair in kind. provide shoring as required. | $10,000 |
| Mar 8, 2017 | Completed final sign-off Jun 2017 | 3821 Lawton St | new rear deck & staircase.Details
new rear deck & staircase. | $12,000 |
| Feb 7, 2017 | Never finaled issued Mar 2017, no final | 689 Lisbon St | repair front and rear deck in kind less than 50%Details
repair front and rear deck in kind less than 50% | $20,000 |