Soil Engineering Construction
- Based in
- Redwood City
- On San Francisco permits
- May 2002 to Aug 2022
- Last 24 months
- 0 permits filed
46 permits since 2000: 33 completed, 9 never finaled, 4 expired or cancelled.
Of the 9 never-finaled permits, 5 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 89 days from filing to permit and 487 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2012 | Completed final sign-off Jan 2014 | 1047 Montgomery St | rebuilt (e) retaining wall that have failed and replace (e) patio with new wood deckDetails
rebuilt (e) retaining wall that have failed and replace (e) patio with new wood deck | $55,000 |
| Aug 26, 2002 | Expired or cancelled expired Feb 2004 | 7 Upper Tr | repair failing retaining wall, repair damaged foundation and deck supportsDetails
repair failing retaining wall, repair damaged foundation and deck supports | $40,000 |