Back to bathroom remodel contractors
Sofiov Design & Build Inc
- Based in
- San Carlos
- On San Francisco permits
- Jul 2025 to Sep 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2025 | Completed final sign-off Dec 2025 | 3300 Baker St | rev to pa# 2025072812: close door from bedroom to guest bath, remove closet and shower walls in guest bath, open new door relocate & replace toilet & vanity, replace shower w/tub & relocate, replace all recessed lights & fan, replace all plumbing fixtures, replace all finish materials, close doorDetails
rev to pa# 2025072812: close door from bedroom to guest bath, remove closet and shower walls in guest bath, open new door relocate & replace toilet & vanity, replace shower w/tub & relocate, replace all recessed lights & fan, replace all plumbing fixtures, replace all finish materials, close door | $35,000 |