Back to bathroom remodel contractors
Smith-Hyder Inc.
- Based in
- Berkeley
- On San Francisco permits
- May 2008 to Sep 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 8 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2020 | Completed final sign-off Jun 2021 | 2970 Broadway | sub basement bath (~8'x10') repair : new tile on 2 walls, replace plaster with sheet rock as needed. replace finishing. new shower value. all work in kind.Details
sub basement bath (~8'x10') repair : new tile on 2 walls, replace plaster with sheet rock as needed. replace finishing. new shower value. all work in kind. | $15,700 |
| Jun 3, 2009 | Completed final sign-off Apr 2010 | 2970 Broadway | interior demolition and partial remodel of 3rd floor including new electrical and new bathroom & fixtures.Details
interior demolition and partial remodel of 3rd floor including new electrical and new bathroom & fixtures. | $75,000 |
| May 22, 2008 | Completed final sign-off Jan 2009 | 2523 Pacific Av | interior remodel of existing 3rd floor (no new conditioned space and no new exterior openings) including selective demo of no load bearing interior walls to create a walk in closet and remodel of existing bathroomDetails
interior remodel of existing 3rd floor (no new conditioned space and no new exterior openings) including selective demo of no load bearing interior walls to create a walk in closet and remodel of existing bathroom | $74,000 |