Slater Construction And Design
- Based in
- San Jose
- On San Francisco permits
- Jul 2020 to Jan 2026
- Last 24 months
- 2 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2026 | Completed final sign-off Mar 2026 | 435 China Basin St | unit #541: bathroom remodel, add 8 recessed lightsDetails
unit #541: bathroom remodel, add 8 recessed lights | $1,750 |
| Nov 12, 2025 | Completed final sign-off Apr 2026 | 2212 15th Av | convert one bathroom into two bathroom to include 1 (n) shower pan.Details
convert one bathroom into two bathroom to include 1 (n) shower pan. | $25,000 |
| Jul 15, 2020 | Completed final sign-off Jul 2021 | 675 Athens St | removed cracked and failing plaster in 2 bedroom, living room, bath and kitchen. replace plaster with drywallDetails
removed cracked and failing plaster in 2 bedroom, living room, bath and kitchen. replace plaster with drywall | $15,000 |