Back to bathroom remodel contractors
Skytech Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2020 to Oct 2026
- Last 24 months
- 11 permits filed
29 permits since 2000: 21 completed, 4 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 9
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
11 bathroom remodel permits: 7 completed, 2 in progress, 2 expired or cancelled. Typically 13 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2026 | In progress issued Oct 2026 | 557 26th Av | interior renovation of unit 557-a @ 1st fl of a 3 story building. scope of work includes: new master suite with 1 new bathroom; kitchen renovation; replace existing non-efficacy lights with led retrofit recessed lights. existing bath to be modified with a walk in shower. new interior finishes.Details
interior renovation of unit 557-a @ 1st fl of a 3 story building. scope of work includes: new master suite with 1 new bathroom; kitchen renovation; replace existing non-efficacy lights with led retrofit recessed lights. existing bath to be modified with a walk in shower. new interior finishes. | $80,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 881 Vallejo St | unit 881a: bathroom remodel, replace vanity. new toilet, new exhaust fan. 1 tub to shower conversion. new tiles.Details
unit 881a: bathroom remodel, replace vanity. new toilet, new exhaust fan. 1 tub to shower conversion. new tiles. | $15,000 |
| Jan 8, 2026 | Completed final sign-off Feb 2026 | 1909 Eddy St | unit 532: remodel two bathrooms, 1 tub to shower conversion.Details
unit 532: remodel two bathrooms, 1 tub to shower conversion. | $35,000 |
| Mar 11, 2025 | Completed final sign-off May 2025 | 1800 Bryant St | unit #201: refinish (2) bathrooms & kitchen in kind.Details
unit #201: refinish (2) bathrooms & kitchen in kind. | $25,000 |
| Oct 24, 2023 | Expired or cancelled expired Nov 2026 | 666 11th Av | revision to pa #202307111920: re-configure bathroom at g/f. relocate bathroom & kitchen at 2/f. relocate bathroom at 3/f.Details
revision to pa #202307111920: re-configure bathroom at g/f. relocate bathroom & kitchen at 2/f. relocate bathroom at 3/f. | |
| Sep 11, 2023 | Completed final sign-off Mar 2024 | 1030 Persia Av | to comply with nov 202182409. remove unpermitted bathroom (and one window), wet bar, and closet behind garage at ground fl.Details
to comply with nov 202182409. remove unpermitted bathroom (and one window), wet bar, and closet behind garage at ground fl. | $1,400 |
| Jul 11, 2023 | Expired or cancelled expired Nov 2026 | 666 11th Av | construct 2 bedroom, media room, bathroom, & wet bar at g/f. remodel (e) kitchen, bathroom. construct 2 bathroom & replace sheetrock w/ new at 2/f. remodel (e) kitchen, bathroom. construct 2 bathroom & replace sheetrock w/ new at 3/f.Details
construct 2 bedroom, media room, bathroom, & wet bar at g/f. remodel (e) kitchen, bathroom. construct 2 bathroom & replace sheetrock w/ new at 2/f. remodel (e) kitchen, bathroom. construct 2 bathroom & replace sheetrock w/ new at 3/f. | $520,000 |
| Apr 11, 2023 | Completed final sign-off Apr 2024 | 44 Newton St | construct 2 bedroom, 1 full bath, & 1 family room. all work on g/f.Details
construct 2 bedroom, 1 full bath, & 1 family room. all work on g/f. | $130,000 |
| Aug 31, 2022 | Completed final sign-off Feb 2023 | 1001 Pine St | refinish (1) kitchen and (1) bathroom in kindDetails
refinish (1) kitchen and (1) bathroom in kind | $25,000 |
| May 17, 2022 | Completed final sign-off Sep 2022 | 145 Bernard St | refinish kitchen and bathroom on both floor in kind.Details
refinish kitchen and bathroom on both floor in kind. | $50,000 |
| Dec 7, 2021 | Completed final sign-off Jan 2023 | 42 Ina Ct | construct 1 bedroom, 2 full bathroom & upgrade (e) family room at ground floor. remodel (e) kitchen, bathroom, and 1 powder room. replace (e) sheet rock w/ new at 2nd floor. construct new deck w/ staircase at rear of house (approx. 18'x7').Details
construct 1 bedroom, 2 full bathroom & upgrade (e) family room at ground floor. remodel (e) kitchen, bathroom, and 1 powder room. replace (e) sheet rock w/ new at 2nd floor. construct new deck w/ staircase at rear of house (approx. 18'x7'). | $86,000 |