Back to bathroom remodel contractors
Skye's The Limit Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2019 to May 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | Completed final sign-off Sep 2026 | 251 San Jose Av | unit #5: kitchen and bathroom upgrades. replace cabinets and fixtures with in kind box materials. replace plumbing and plumbing fixtures and cabients with in kind materials. no structural work to be done.Details
unit #5: kitchen and bathroom upgrades. replace cabinets and fixtures with in kind box materials. replace plumbing and plumbing fixtures and cabients with in kind materials. no structural work to be done. | $25,000 |
| Nov 15, 2022 | Completed final sign-off Mar 2023 | 133 Buena Vista Tr | remodel bathroom - remove bath tub and replace with walk in shower. replace all other fixtures in kind. remove and replace exisitng exhaust fan. no removal of wallsDetails
remodel bathroom - remove bath tub and replace with walk in shower. replace all other fixtures in kind. remove and replace exisitng exhaust fan. no removal of walls | $7,500 |
| Jun 2, 2022 | Completed final sign-off Dec 2025 | 1201 Church St | 1st flr - accessible ada compliant upgrades to (e) bathroom including expansion of space to allow for accessible clearances and addition of a storage room adjacent to accessible bathroom.Details
1st flr - accessible ada compliant upgrades to (e) bathroom including expansion of space to allow for accessible clearances and addition of a storage room adjacent to accessible bathroom. | $35,973 |
| Nov 18, 2021 | Never finaled issued Nov 2021, no final | 1507 Sanchez St | demo all lathe and plaster in unit. demo existing bathroom fixtures. replace fixtures/plumbing in kind. install new electrical in all rooms except kitchen. new hardwired smoke and co2 alarms. new insulation and sheetrock.install 5/8 board type x on ceiling and all walls.Details
demo all lathe and plaster in unit. demo existing bathroom fixtures. replace fixtures/plumbing in kind. install new electrical in all rooms except kitchen. new hardwired smoke and co2 alarms. new insulation and sheetrock.install 5/8 board type x on ceiling and all walls. | $20,000 |