Sky Art Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Feb 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2020 | Completed final sign-off Sep 2020 | 325 Joost Av | replace extg cabinets with same. replace extg window with same. reframe extg pass though. reframe extg entrance to kitchen.Details
replace extg cabinets with same. replace extg window with same. reframe extg pass though. reframe extg entrance to kitchen. | $30,000 |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 1655 Jones St | remodel extg bathroom with mnew fixtures on the 3rd floor of bldg. no structural workDetails
remodel extg bathroom with mnew fixtures on the 3rd floor of bldg. no structural work | $10,000 |
| Jan 11, 2018 | Completed final sign-off Apr 2018 | 117 Noe St | master bath renovation, remove existing tub and shower stall. replace with shower only, replace e vanity and replace w same. replace existing lighting and replace with upgraded led lighting. replace e plumbing.Details
master bath renovation, remove existing tub and shower stall. replace with shower only, replace e vanity and replace w same. replace existing lighting and replace with upgraded led lighting. replace e plumbing. | $15,000 |
| Dec 6, 2017 | Completed final sign-off Aug 2019 | 758 Clayton St | remove e non bearing wall and pocket door. remove e door and raise head to match hallway entry heightDetails
remove e non bearing wall and pocket door. remove e door and raise head to match hallway entry height | $10,000 |
| Nov 1, 2016 | Completed final sign-off Apr 2017 | 4 Lansdale Av | new window to be installed in front of house. existing window above front door to be covered.Details
new window to be installed in front of house. existing window above front door to be covered. | $500 |
| Jul 12, 2016 | Completed final sign-off Apr 2017 | 4 Lansdale Av | remodel kitchen and bath. add guest bath aupgrade & install lighting. add & remodel closet in master bedroomDetails
remodel kitchen and bath. add guest bath aupgrade & install lighting. add & remodel closet in master bedroom | $75,000 |
| Apr 22, 2016 | Completed final sign-off Sep 2016 | 76 Sussex St | kitchen remodel: replace cabinets, install 10 recess lights and new sub-panel. no structural work.Details
kitchen remodel: replace cabinets, install 10 recess lights and new sub-panel. no structural work. | $15,000 |
| Mar 2, 2016 | Completed final sign-off Aug 2017 | 406 Chenery St | conversion of existing utility into accessory dwelling studio unit.Details
conversion of existing utility into accessory dwelling studio unit. | $40,000 |