Back to bathroom remodel contractors
Sjn Construction Llc
- Based in
- Colfax
- On San Francisco permits
- Sep 2017 to Nov 2025
- Last 24 months
- 5 permits filed
17 permits since 2000: 11 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2025 | Completed final sign-off Apr 2026 | 284 Allison St | legalize unpermitted conversion of part of garage to living space including bedroom hallway , bonus room with wet bar and bathroomDetails
legalize unpermitted conversion of part of garage to living space including bedroom hallway , bonus room with wet bar and bathroom | $24,000 |
| Oct 17, 2023 | Completed final sign-off Feb 2024 | 159 Clearfield Dr | kitchen & 2 bathroom remodels. replace all fixtures like for like. hallway bathroom install new elec & bathtub. master bathroom replace (e) shower pan w/ new tile shower pan & install new elec. install new subpanel in garageDetails
kitchen & 2 bathroom remodels. replace all fixtures like for like. hallway bathroom install new elec & bathtub. master bathroom replace (e) shower pan w/ new tile shower pan & install new elec. install new subpanel in garage | $45,000 |
| May 23, 2023 | Completed final sign-off Jun 2023 | 536 Arlington St | bath remodel: change fixtures and finishes.Details
bath remodel: change fixtures and finishes. | $20,000 |
| Mar 27, 2023 | Completed final sign-off Aug 2024 | 3967 22nd St | vertical & horizontal addition to incude two story addition @ (e)patio area,add dormer to 2nd story facing west,remove wall @ entry/living room,new extension @ entry @ front,remodel 2nd story bath & kitchen.Details
vertical & horizontal addition to incude two story addition @ (e)patio area,add dormer to 2nd story facing west,remove wall @ entry/living room,new extension @ entry @ front,remodel 2nd story bath & kitchen. | $250,000 |
| Mar 9, 2023 | Completed final sign-off Jul 2023 | 40 Murray St | remodel kitchen and bathroom on 2nd floor. replace fixtures and finishes on 1st floor bath. fix dry rot around (e) doors and windows on exterior.Details
remodel kitchen and bathroom on 2nd floor. replace fixtures and finishes on 1st floor bath. fix dry rot around (e) doors and windows on exterior. | $50,000 |
| Dec 27, 2022 | Completed final sign-off May 2023 | 519 34th Av | unit 519: remodel (2)bathrooms/(1)kitchen @ 2/f, remodel 3rd bath @1/f. replace (2)bathtubs/shower valves, convert (1)tub to shower, upgrade elec panel/wiring for kitchen & (3)bathrooms; unit 521: remodel (2)bathrooms @ 3/f, remodel (1) kitchen, replace fixtures/finishes in-kind,Details
unit 519: remodel (2)bathrooms/(1)kitchen @ 2/f, remodel 3rd bath @1/f. replace (2)bathtubs/shower valves, convert (1)tub to shower, upgrade elec panel/wiring for kitchen & (3)bathrooms; unit 521: remodel (2)bathrooms @ 3/f, remodel (1) kitchen, replace fixtures/finishes in-kind, | $140,000 |
| Sep 20, 2022 | Completed final sign-off Dec 2022 | 141 States St | kitchen and bath renovation. new fixtures and finishes.Details
kitchen and bath renovation. new fixtures and finishes. | $60,000 |
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 306 Lily St | one kitchen and one bath renovation. new fixtures and finishes.Details
one kitchen and one bath renovation. new fixtures and finishes. | $35,000 |
| Oct 13, 2021 | Never finaled issued Sep 2022, no final | 205 Fairmount St | 1st fl - relocate laundry, add fire rate wall around garage & add 2 full baths. add 1 bedroom @ front w/window on facade.Details
1st fl - relocate laundry, add fire rate wall around garage & add 2 full baths. add 1 bedroom @ front w/window on facade. | $50,000 |