27 permits since 2000: 23 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2018 | Completed final sign-off Dec 2018 | 527 Euclid Av | water damage. remodel finishes & cabinetry in kitchen, 2 bathrooms, family room. 1 shower to covert to steam shower, 1 laundry room. replace damged sheet rock, upgrade electrical & plumbing to codes. flooring.Details
water damage. remodel finishes & cabinetry in kitchen, 2 bathrooms, family room. 1 shower to covert to steam shower, 1 laundry room. replace damged sheet rock, upgrade electrical & plumbing to codes. flooring. | $110,000 |
| Jan 26, 2015 | Completed final sign-off Jun 2015 | 180 Lower Tr | convert exterior entry/stairs into interior entry/stairs,replace gate with new door. add shower to (e) 1st flr, bath, update wall finishes in bedrm 3; relocate (e) laundry to new laundry rm, refinish (e) utility rm for new family den, replace (e) furnace with newDetails
convert exterior entry/stairs into interior entry/stairs,replace gate with new door. add shower to (e) 1st flr, bath, update wall finishes in bedrm 3; relocate (e) laundry to new laundry rm, refinish (e) utility rm for new family den, replace (e) furnace with new | $28,000 |
| Aug 30, 2012 | Completed final sign-off Aug 2013 | 780 12th Av | 1st bath:new tile, new sink and vanity, new lights, and paint. 2nd bath: new tile, new sink and vanity, new shower with corian shower pan, new light, paint, and new window.Details
1st bath:new tile, new sink and vanity, new lights, and paint. 2nd bath: new tile, new sink and vanity, new shower with corian shower pan, new light, paint, and new window. | $18,500 |
| Apr 1, 2011 | Completed final sign-off Jun 2011 | 108 Bronte St | construction of storage room and bathroom amd laundry room in garage. installation of radiant heat on lower floor, new hot water heater, new window and door in extg location.Details
construction of storage room and bathroom amd laundry room in garage. installation of radiant heat on lower floor, new hot water heater, new window and door in extg location. | $44,093 |
| Sep 3, 2009 | Completed final sign-off Jan 2010 | 294 Page St | remodel bathroom, new fixtures & tile fllor. no structuralDetails
remodel bathroom, new fixtures & tile fllor. no structural | $27,000 |
| Feb 29, 2008 | Completed final sign-off Aug 2008 | 1170 Sacramento St | interior cosmetic remodel. replace bathroom carbinets, make changes to ex. flooring materials in the entire unit, relocate stove and sink in kitchen and replace kitchen carbinets.Details
interior cosmetic remodel. replace bathroom carbinets, make changes to ex. flooring materials in the entire unit, relocate stove and sink in kitchen and replace kitchen carbinets. | $125,000 |
| Mar 7, 2007 | Completed final sign-off Dec 2007 | 760 Dolores St | remodel to (e) dining room, kitchen & bath on 1/f of unit #1, demo (e) bath and relocate as 1/2 bath, move (e) kitchen/dining room wall to enlarge (e) dining room. install new windows, french doors & sliding doors, reconfigure & move exterior decking to new door locations. remove (e) basement door.Details
remodel to (e) dining room, kitchen & bath on 1/f of unit #1, demo (e) bath and relocate as 1/2 bath, move (e) kitchen/dining room wall to enlarge (e) dining room. install new windows, french doors & sliding doors, reconfigure & move exterior decking to new door locations. remove (e) basement door. | $180,000 |
| Nov 23, 2004 | Completed final sign-off Jan 2005 | 33 Walnut St | demo of living room ceiling at 2nd floor, demo bath finishes and 2 bedroom ceilings at 3rd flr, demoDetails
demo of living room ceiling at 2nd floor, demo bath finishes and 2 bedroom ceilings at 3rd flr, demo | $2,000 |