Back to bathroom remodel contractors
Singh Construction
- Based in
- Corona
- On San Francisco permits
- Nov 2013 to Aug 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 1 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 372 days from filing to permit and 1004 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2021 | Completed final sign-off Aug 2021 | 3356 Cesar Chavez St | #b. kitchen remodel - replace sink, faucet, hood, cabinets and counter top. upgrade all plumbing & electricla to meet code. bathroom remodel - replace tub, toilet, cabinet. upgrade all plumbing & electrical. paint entire unit, new drywall.Details
#b. kitchen remodel - replace sink, faucet, hood, cabinets and counter top. upgrade all plumbing & electricla to meet code. bathroom remodel - replace tub, toilet, cabinet. upgrade all plumbing & electrical. paint entire unit, new drywall. | $25,000 |
| Jun 14, 2017 | Completed final sign-off Jul 2024 | 453 Buena Vista East Av | renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r.Details
renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r. | $890,500 |