Back to bathroom remodel contractors
Simply Economy Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Sep 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 41 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2021 | Completed final sign-off Aug 2022 | 1414 40th Av | proposed to remodel kitchen & bathroom, add 1 mster bathroom and replace 4 rear windows as shown on proposed planDetails
proposed to remodel kitchen & bathroom, add 1 mster bathroom and replace 4 rear windows as shown on proposed plan | $65,000 |
| Jan 22, 2019 | Completed final sign-off Mar 2019 | 438 25th Av | apt 4: replace tile and bath tub faucet.Details
apt 4: replace tile and bath tub faucet. | $2,000 |
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 1477 23rd Av | bathroom repair tiles, replace toilet, replace vanity sink/cabinet.Details
bathroom repair tiles, replace toilet, replace vanity sink/cabinet. | $2,000 |
| Aug 25, 2017 | Completed final sign-off Sep 2017 | 438 25th Av | apt #1 - repair tiles in bathroomDetails
apt #1 - repair tiles in bathroom | $800 |
| Apr 28, 2016 | Completed final sign-off Jun 2016 | 624 12th Av | 3rd flr: remodel (e) bathroom & add one bathroom, 2nd flr: remodel kitchen.Details
3rd flr: remodel (e) bathroom & add one bathroom, 2nd flr: remodel kitchen. | $25,000 |