Back to bathroom remodel contractors
Silverman Green Development
- Based in
- Larkspur
- On San Francisco permits
- Jan 2021 to Oct 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 22 days from filing to permit and 40 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2024 | Completed final sign-off Mar 2024 | 704 Bush St | unit #302. to comly w/ nov 202418642: install a single hinged outswing window in place of current set up. in bathroom, in kind. max. u-factor=0.30Details
unit #302. to comly w/ nov 202418642: install a single hinged outswing window in place of current set up. in bathroom, in kind. max. u-factor=0.30 | $5,000 |
| Nov 17, 2023 | In progress issued Dec 2023 | 1964 Post St | unit #3: bathroom remodel, no layout change, relocate kitchen to central living space add stackable washer/dryer, move electrical sub-panel from inside closet, wire kitchen, laundry. (n) office at kitchen.Details
unit #3: bathroom remodel, no layout change, relocate kitchen to central living space add stackable washer/dryer, move electrical sub-panel from inside closet, wire kitchen, laundry. (n) office at kitchen. | $40,000 |
| Oct 18, 2023 | Completed final sign-off Jan 2024 | 1168 Montgomery St | (unit #1168) to comply w/ complaint# 202313229 and 202312835: kitchen (90 sf) and bath (40 sf) remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work required. unit# 1168 only.Details
(unit #1168) to comply w/ complaint# 202313229 and 202312835: kitchen (90 sf) and bath (40 sf) remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work required. unit# 1168 only. | $30,000 |