Signature Const. Co., Inc
- Based in
- Burlingame
- On San Francisco permits
- Aug 2001 to Dec 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2021 | Completed final sign-off Apr 2022 | 185 Berry St | install 4 monitors at 185 berry street lobby 6, suite 180b and suite 190. provide power and data if required.Details
install 4 monitors at 185 berry street lobby 6, suite 180b and suite 190. provide power and data if required. | $4,000 |
| May 15, 2018 | Completed final sign-off Apr 2019 | 3805 26th St | to comply with nov201858551. fire damange repair to include: install 4 windows, 3 doors & frames. replace redwood siding in back of building. ref with hardwood floors. sheetrock, plaster ceiling, patching & painting. replace fence at side of property at no more than 6ft ht.Details
to comply with nov201858551. fire damange repair to include: install 4 windows, 3 doors & frames. replace redwood siding in back of building. ref with hardwood floors. sheetrock, plaster ceiling, patching & painting. replace fence at side of property at no more than 6ft ht. | $52,000 |
| Jul 19, 2017 | Completed final sign-off Apr 2018 | 711 Van Ness Av | #440: t.i for 4th fl: demo, framing, sheetrock, painting, carpet. convert closet to a bathroom. minor ada upgrades at core bathroomsDetails
#440: t.i for 4th fl: demo, framing, sheetrock, painting, carpet. convert closet to a bathroom. minor ada upgrades at core bathrooms | $45,000 |
| May 2, 2017 | Never finaled issued May 2017, no final | 350 Parnassus Av | minor revision to 201701278092: delete flat strap lateral bracingDetails
minor revision to 201701278092: delete flat strap lateral bracing | |
| Mar 30, 2017 | Never finaled issued May 2017, no final | 350 Parnassus Av | revision to app#201701278092. revise ceiling work and install new ceiling tile.Details
revision to app#201701278092. revise ceiling work and install new ceiling tile. | $3,000 |
| Jan 27, 2017 | Completed final sign-off Nov 2017 | 350 Parnassus Av | suite 505 5th fl - renovation of e vacant medical office space suite 505 5th fl of bldg. new plumbing and electrical, new walls for mission wellness pharmacy. f/a, sprinklers under separate permit.Details
suite 505 5th fl - renovation of e vacant medical office space suite 505 5th fl of bldg. new plumbing and electrical, new walls for mission wellness pharmacy. f/a, sprinklers under separate permit. | $35,000 |
| Mar 29, 2016 | Completed final sign-off Dec 2016 | 3575 Geary Bl | grd fl: convert med room to exam room and 2 offices. relocate med room to existing work room. n/a maher ord. 155-13Details
grd fl: convert med room to exam room and 2 offices. relocate med room to existing work room. n/a maher ord. 155-13 | $20,000 |
| Aug 21, 2015 | Completed final sign-off Sep 2015 | 170 Ofarrell St | 1st flr: anchor 5 display cases. maher naDetails
1st flr: anchor 5 display cases. maher na | $2,700 |
| Jul 6, 2012 | Completed final sign-off Mar 2013 | 350 Parnassus Av | 6th floor:minor demolition, new partition, door frame finishes, ceiling,lighting and casework. electrical and mechanical under separate permit. sprinker and f.s. under seperate permit.Details
6th floor:minor demolition, new partition, door frame finishes, ceiling,lighting and casework. electrical and mechanical under separate permit. sprinker and f.s. under seperate permit. | $35,000 |
| Apr 24, 2008 | Completed final sign-off Jul 2008 | 2200 Sacramento St | demo existing wood framing.replace with new metal studs and 5/8" sheetrock and fire tape for inspector requested fire rated wall. non structural.Details
demo existing wood framing.replace with new metal studs and 5/8" sheetrock and fire tape for inspector requested fire rated wall. non structural. | $1,200 |
| Feb 22, 2008 | Completed final sign-off Mar 2008 | 350 Parnassus Av | life safety modification for 1st floor. add 2 new strobes.Details
life safety modification for 1st floor. add 2 new strobes. | $8,000 |
| Sep 26, 2007 | Completed final sign-off Jan 2008 | 746 Sanchez St | repair stairs & side wall at front porch fornt of house . repair in kind stair and sidewalls.Details
repair stairs & side wall at front porch fornt of house . repair in kind stair and sidewalls. | $1,200 |
| May 10, 2007 | Never finaled issued May 2007, no final | 3838 California St | renew 200505263527 and 200309265896Details
renew 200505263527 and 200309265896 | |
| Apr 25, 2002 | Completed final sign-off Jul 2002 | 3251 20th Av | comply nov dated 3/13/02 w/ ed greene. install high guard rail sys. by 4/26/02.Details
comply nov dated 3/13/02 w/ ed greene. install high guard rail sys. by 4/26/02. | $3,000 |
| Apr 12, 2002 | Completed final sign-off Jan 2003 | 350 Parnassus Av | demolition of the existing concealed spline ceiling & cons. of new accoustical lay in system. the scDetails
demolition of the existing concealed spline ceiling & cons. of new accoustical lay in system. the sc | $50,000 |
| Aug 31, 2001 | Completed final sign-off Feb 2002 | 350 Parnassus Av | new wall/door and frame/new switching for fluorescent light fixtureDetails
new wall/door and frame/new switching for fluorescent light fixture | $4,300 |