Sierra West Electric Inc.
- Based in
- Auburn
- On San Francisco permits
- Dec 2013 to Dec 2013
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2013 | Never finaled issued Sep 2014, no final | 512 Van Ness Av | to comply with nov #201384906. run 21" conduits from mmbs to nid equip w/ power & fiber grounding. build h frame w/ uni strut 1" conduit to telco set breaker box w/ breaker. ** maher: compliance with ordinance no# 155-13 not required **Details
to comply with nov #201384906. run 21" conduits from mmbs to nid equip w/ power & fiber grounding. build h frame w/ uni strut 1" conduit to telco set breaker box w/ breaker. ** maher: compliance with ordinance no# 155-13 not required ** | $3,500 |