Back to bathroom remodel contractors
Shoshan Construction Services
- Based in
- Kentfield
- On San Francisco permits
- Nov 2016 to Aug 2026
- Last 24 months
- 4 permits filed
12 permits since 2000: 8 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 in progress. Typically 57 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2025 | In progress issued Dec 2025 | 173 Downey St | renovate kitchen. renovate 3 bathrooms. add (1) new bathroom on 3/f and (1) half bath on 2/f. new elevator, new radiant heating at all 3 floors. new air conditioning at 3/f.Details
renovate kitchen. renovate 3 bathrooms. add (1) new bathroom on 3/f and (1) half bath on 2/f. new elevator, new radiant heating at all 3 floors. new air conditioning at 3/f. | $378,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 173 Downey St | renovate first floor bathroomDetails
renovate first floor bathroom | $24,000 |
| Jun 17, 2022 | Completed final sign-off Oct 2024 | 1352 45th Av | voluntary structural strengthening. partial tunnel infill legalize extg level 1 bath & bedroom. kitchen remodel. level 2 bath remodel. rear only -new window, new siding, new skylight, new solar pv & thermal.Details
voluntary structural strengthening. partial tunnel infill legalize extg level 1 bath & bedroom. kitchen remodel. level 2 bath remodel. rear only -new window, new siding, new skylight, new solar pv & thermal. | $360,000 |
| Jun 25, 2021 | Completed final sign-off Mar 2022 | 3532 California St | interior remodel, not visible from the street. remodel kitchen, remove window and relocate window/ shift it. add powder room. remodel (e) bathroom in kind.Details
interior remodel, not visible from the street. remodel kitchen, remove window and relocate window/ shift it. add powder room. remodel (e) bathroom in kind. | $70,000 |
| Nov 23, 2020 | Completed final sign-off Nov 2021 | 519 Baker St | interior kitchen and bath renovation. removal and replacement of 1 door & 2 windows at rear of building with minor modifications (not visible from the street). relocate laundry room from 2/f to 3/f. addition of 1 skyliight at rear flat of roof area.Details
interior kitchen and bath renovation. removal and replacement of 1 door & 2 windows at rear of building with minor modifications (not visible from the street). relocate laundry room from 2/f to 3/f. addition of 1 skyliight at rear flat of roof area. | $65,000 |
| Aug 31, 2017 | Completed final sign-off Feb 2018 | 757 09th Av | kitchen renovation & addition of small half bath in existing upper level unit fo a two unit residential bldg . total proposed sq ft to be renovated is 210 sf. bldg footprint to remain unchanged.Details
kitchen renovation & addition of small half bath in existing upper level unit fo a two unit residential bldg . total proposed sq ft to be renovated is 210 sf. bldg footprint to remain unchanged. | $70,000 |